background image

43

Installation and Servicing

 

SECTION 3 - SERVICING

7

3.21  DHW FLOW REGULATOR

1. 

Isolate and drain down the HIU. Refer to Section 3.5.

2. 

Remove the front panel. Refer to Section 3.4.

3. 

Remove insulation front section. Refer to Section 3.12.

4. 

Disconnect the connector on the flow turbine harness. 

5. 

Slacken and disconnect isolation valve nut on the mains 

DCW feed into the HIU appliance on the first fix bracket.

6. 

Remove and retain the two screws securing the manifold 
to the bottom panel.

7. 

Slacken and disconnect pipe nut into the DHW plate from 
the cold feed (top left of plate heat exchanger).

8. 

Lift up and rotate cold water feed pipe leg with manifold 
attached out from the HIU.

9. 

Using a pair of pliers, pull out/remove plastic flow 

regulator.

10. 

Clean the inlet mesh filter, check the O-ring seal and refit 

with the filter mesh facing outward. If replacing the flow 

restrictor cartridge, ensure that it is correctly sized for the 

unit it is been fitted to and cartridge colour coding is the 

same.

11. 

Re-assemble in reverse order, replacing all gaskets where 
appropriate.

12. 

Refill the HIU. Refer to Section 2.5. 

13. 

Check that the HIU operates in both DHW & CH modes.

3.22  DHW FLOW MANIFOLD WITH INTEGRATED TURBINE ASSEMBLY REPLACEMENT 

1. 

Isolate and drain down the HIU. Refer to Section 3.5. 

2. 

Remove the front panel. Refer to Section 3.4. 

3. 

Remove insulation front section. Refer to Section 3.12. 

4. 

Disconnect the connector on the flow turbine harness.  

5. 

Slacken and disconnect isolation valve nut on the mains DCW feed into the HIU appliance 

on the first fix bracket.

6. 

Remove and retain the two screws securing the manifold to the bottom panel. 

7. 

Slacken and disconnect pipe nut into the DHW plate from the cold feed (top left of plate heat 
exchanger). 

8. 

Lift up and rotate cold water feed pipe leg with manifold attached out from the HIU. 

9. 

Using a suitable tool retract the metal pipe clip and remove the pipe from the manifold.

10. 

Using a pair of pliers pull out / remove the plastic flow regulator from the base of the 

manifold inlet. Make sure the complete cartridge has been removed from the inlet of the 
manifold.

11. 

Clean the inlet mesh filter, check the O-ring seal and refit with the filter mesh facing outward. 

If replacing the flow restrictor cartridge, ensure that it is correctly sized for the unit it is been 

fitted to and cartridge colour coding is the same.

12. 

Replace the O-ring on the cold water feed pipe and insert into new DHW flow turbine 

housing manifold. 

13. 

Re-assemble metal pipe clip. 

14. 

Re-assemble in reverse order, replacing all gaskets where appropriate. 

15. 

Refill the HIU. Refer to Section 2.5. 

16. 

Check that the HIU operates in both DHW and CH modes. 

9

10

SER

VICING

Содержание i305

Страница 1: ...rts that have not been clearly authorised by Ideal Heating For the very latest copy of literature for specification and maintenance practices visit our website idealheating com where you can download...

Страница 2: ...2 Installation and Servicing...

Страница 3: ...03 July 21 Updated images additional Section 3 17 Domestic Hot Water Thermistor Ideal Heating reserve the right to vary specification without notice FOR ANY TECHNICAL QUERIES PLEASE RING THE IDEAL INS...

Страница 4: ...4 Installation and Servicing...

Страница 5: ...NG 29 3 1 Servicing Schedule 29 3 2 Key Components Indirect 30 3 3 Key Components Direct 31 3 4 HIU Front Panel Removal Replacement 32 3 5 Draining The Heat Interface Unit 32 3 6 Primary Strainer Remo...

Страница 6: ...to operate at 0 6 bar system pressure bar PSI kPa 0 5 bar 7 25 50 Maximum Operational DHW Temperature dependant on primary supply C 65 C 70 C to 85 C Primary Maximum Primary Supply Pressure bar PSI k...

Страница 7: ...min 9 7 13 3 16 7 19 0 22 4 9 7 13 3 16 7 19 0 DHW Output 55 C 45K rise kW 30 7 39 9 50 6 57 9 63 4 30 7 39 9 50 6 57 9 Primary Flow Rate l s 0 16 0 21 0 26 0 29 0 32 0 16 0 21 0 26 0 29 Primary Retur...

Страница 8: ...has not operated in a 24 hour period the control will operate the valve briefly to prevent the valve from becoming stuck in position Construction the HIU casing and front door is of white painted mil...

Страница 9: ...be made to the current ETCI rules for electrical installation Detailed recommendations are contained in the following British Standard Codes of Practice CIBSE CP1 2020 Heat Network code of practice B...

Страница 10: ...le isolator and where practical replacement installations the isolator shall be situated adjacent to the appliance 0 6m Zone 0 Recessed window Zone 2 Ceiling 3G8913a 2 25m Zone 1 Compartment Installat...

Страница 11: ...25mm from the outward opening cupboard door 600mm overall clearance is still required with a cupboard door open to allow for servicing Bottom Clearance The bottom clearance from the underside of the w...

Страница 12: ...m and maximum working pressures In areas of low mains water pressures the domestic hot water regulator may be removed from the DHW flow turbine manifold Refer to Section 3 21 The HIU will require the...

Страница 13: ...the Guidance Notes on Water Treatment in Central Heating Systems If water treatment is used Ideal Heating recommend only the use of SCALEMASTER SM 1 PRO FERNOX MBI ADEY MC1 SENTINEL X100 or CALMAG CM1...

Страница 14: ...Primary Flow Pipe DHW 2 131 Primary Flow Pipe CH 1 132 Primary Flow Pipe CH 2 133 Primary Return Pipe 136 CH Flow Pipe Indirect 137 CH Return Pipe Indirect 138 CH Return PIPE Direct 139 CH Flow Pipe...

Страница 15: ...damage to the pressure relief out pipe and valve Care MUST be taken to support the appliance during lifting This should be done by 2 people due to the weight of the unit DO NOT LIFT THE APPLIANCE VIA...

Страница 16: ...horizontal c Remove brass plugs from the top of the isolation valves if used Discard any used gaskets 4 Lift the HIU onto the wall mounting plate refer to the Introduction section for safe handling a...

Страница 17: ...the dust cap from valve A and plug from the filling loop adjacent to valve A 3 Ensure top hat washers is still fitted to the valve A if not then check inside the removed dust cap 4 Connect the filling...

Страница 18: ...n section 3 12 to gain access to the Primary and CH Air Vents 2 Ensure isolation valves C D E and F are in closed position handle horizontal 3 Turn the black handle on isolation valve D so it is point...

Страница 19: ...pole switch having 3mm contact separation in both poles The means of isolation must be accessible to the user after installation WARNING This appliance MUST be earthed All electrical work within the u...

Страница 20: ...ostat has compensation and requires a neutral connection make this connection to the fused spur on the load side See Diagram C Optional External Controls Extra Low Voltage Wiring OpenTherm Room Contro...

Страница 21: ...al Turbine GND Turbine 5V WPS Signal WPS GND WPS 5V DHW Valve Q1 Q3 DHW Valve Q2 Q4 DHW Valve Q5 Q7 DHW Valve Q6 Q8 CH Valve Q1 Q3 CH Valve Q2 Q4 CH Valve Q5 Q7 CH Valve Q6 Q8 MAINS LIVE MAINS NEUTRAL...

Страница 22: ...ll the relevant parameters to provide efficient operation of the HIU and the Heat Network A B C D E F G Electrical Installation 1 Checks to ensure electrical safety should be carried out by a competen...

Страница 23: ...ed limits Note If using underfloor heating ensure CH target temperature is within the safe operating temperature for the underfloor heating Switching CH On Off Press the Menu button again to access th...

Страница 24: ...W demand the display will show the tap symbol and the DHW delivery temperature With a CH demand the display will show the radiator symbol and the CH delivery temperature If Preheat is enabled the HIU...

Страница 25: ...lowing options II Indirect indirect dI Direct indirect It N A Dt N A Press the Menu button when the correct option is selected Press the button to cycle through the following options Indirect II 30 40...

Страница 26: ...s Press the Menu button to progress to the DHW Valve Replacement service mode If buttons are pressed the DHW valve will drive fully open for up to 30 minutes This may be required if the valve body nee...

Страница 27: ...activation display Press buttons to enable disable the primary return limitation function Note This function is independent of the Credit control valve accessory behaviour Press the Menu button again...

Страница 28: ...es under the relevant national regulations 2 Explain and demonstrate the start up and shutting down procedures 3 The operation of the HIU and the use and adjustment of all system controls should be fu...

Страница 29: ...er to Section 4 fault finding as necessary Warning Always isolate all service valves switch off and disconnect the electrical supply to the appliance before servicing 5 Check the DHW filter for blocka...

Страница 30: ...rimary Return Assembly 9 Manifold DHW Flow Assembly 10 Manifold DCW Assembly 11 PICV DN20 12 PICV DN15 13 Air Vent DCW 14 Air Vent Primary 15 Air Vent CH 16 PRV 17 Auto Air Vent 18 Pump Head 19 Pressu...

Страница 31: ...t CH 7 Manifold Primary Flow Assembly 8 Manifold Primary Return Assembly 9 Manifold DHW Flow Assembly 10 Manifold DCW Assembly 11 PICV DN20 12 PICV DN15 13 Air Vent DCW 14 Air Vent Primary 15 Air Vent...

Страница 32: ...imary circuit both flow and return isolation valves MUST be isolated Failure to do this will subject the drain point to system pressure when opened and cause the full system to be drained NOTE INDIREC...

Страница 33: ...be engaged 4 Check that the HIU operates in both DHW CH modes 3 7 CH PRESSURE GAUGE REPLACEMENT INDIRECT ONLY 1 1 Isolate and drain primary circuit refer to Section 3 5 2 Refer to Section 3 4 for fron...

Страница 34: ...pansion vessel 11 Fit the new expansion vessel 12 Reassemble in reverse order ensuring the seal is in place 13 Refill the HIU and check for leaks Refer to Section 2 5 14 Check that the HIU operates in...

Страница 35: ...e HIU operates in both DHW CH modes 3 11 PUMP AUTOMATIC AIR VENT REMOVAL REPLACEMENT 1 Refer to Section 3 4 for front panel removal 2 Isolate and drain the HIU Refer to Section 3 5 3 Remove the expans...

Страница 36: ...TION FRONT SECTION REMOVAL REPLACEMENT 1 Refer to Section 3 4 for front panel removal 2 Remove harness from the insulation channel and lower down 3 Remove front insulation section by pulling forward a...

Страница 37: ...heir outlets facing left and right and the 2 x 60 elbows are fitted with their outlet facing downwards Note Failure to correctly locate the poisition of the elbows will prevent the retention clips fro...

Страница 38: ...ws are fitted with their outlet facing downwards Note Failure to correctly locate the poisition of the elbows will prevent the retention clips from being fitted 11 Ensure new retention clips are locat...

Страница 39: ...er provided 6 Reassemble in the reverse order 7 Refill the HIU Refer to Section 2 5 8 Check that the HIU operates in both DHW CH modes 1 Isolate and drain the HIU Refer to Section 3 5 2 Remove the fro...

Страница 40: ...ould be used 6 Fit the new thermistor 7 Reassemble in the reverse order 8 Refill the HIU Refer to Section 2 5 9 Check that the HIU operates in both DHW CH modes 3 17 DOMESTIC HOT WATER THERMISTOR 3 18...

Страница 41: ...and pull the PRV upward to remove it from the manifold 5 Reassemble in reverse order ensuring the retaining clip is correctly fitted the pipe compression fitting re tightened and return thermistor is...

Страница 42: ...at the mains wait for 10 seconds and power on again d Display shows F9 e Press the or button to progress to the HIU type setting screen f Using the or button the display will be able to by cycled betw...

Страница 43: ...nd drain down the HIU Refer to Section 3 5 2 Remove the front panel Refer to Section 3 4 3 Remove insulation front section Refer to Section 3 12 4 Disconnect the connector on the flow turbine harness...

Страница 44: ...the valve The unit must be then turned off at the mains and back on to allow the valve to recalibrate its position 1 Isolate the mains electrical supply 2 Remove the front panel Refer to Section 3 4...

Страница 45: ...flow filter manifold 8 Place both halves of the plastic adapter around the 3 notches of the temperature sensor 9 Press the adapter together and screw hand tight 3 5 Nm into the primary flow filter ma...

Страница 46: ...eaks 17 Activate the meter and follow the heat meter instructions provided to commission and setup the meter 18 Ensure control box cover can move freely and the front panel can be secured without trap...

Страница 47: ...THIS PAGE HAS BEEN LEFT INTENTIONALLY BLANK...

Страница 48: ...on flow thermistor and using a multi meter measure the resistance of the thermistor This should be around 10k in ambient conditions If thermistor is functioning correctly reconnect harness to flow th...

Страница 49: ...using the process as shown in Section 3 20 HOT WATER PREHEAT fp OFF Pump Failure Check system water pressure is between 1 and 1 5 bar on the system pressure gauge If system pressure is low increase th...

Страница 50: ...pplied to the HIU Replace PICV as shown in Section 3 24 NO NO NO NO YES YES YES YES No CH operation but DHW OK Is the Tap symbol shown on the display during a DHW demand Ensure the wiring between the...

Страница 51: ...ter Pressure Sensor Fault F1 No CH operation 11 DHW Sensor disconnected from pipe FC DHW Valve to closed position 51 Low Water Pressure F1 No CH operation 63 High Mains Voltage N A N A 64 Low Mains Vo...

Страница 52: ...eal Failure to do so could affect safety or performance of this appliance Comprehensive spares parts information and details of approved Ideal Parts Distributors are available on idealheating com Our...

Страница 53: ...res Has a domes c hea ng system lter been installed Yes No CENTRAL HEATING MODE measure and record for direct appliances record only primary ow return in central hea ng mode Primary di eren al pressur...

Страница 54: ...ure checked adjusted Yes CH system expansion vessel pressure checked adjusted Yes CH system ll pressure checked adjusted as necessary Yes CH system ll pressure checked adjusted as necessary Yes DHW Co...

Страница 55: ...ure checked adjusted Yes CH system expansion vessel pressure checked adjusted Yes CH system ll pressure checked adjusted as necessary Yes CH system ll pressure checked adjusted as necessary Yes DHW Co...

Страница 56: ...ufactured under an ISO 9001 registered quality management system FM 59915 At Ideal Heating we take our environmental impact seriously therefore when installing any Ideal Heating product please make su...

Отзывы: