11
Installation and Servicing
SECTION 1 - GENERAL
1.12 HIU DIMENSIONS, SERVICES & CLEARANCES
HIU Dimensions, Services & Clearances
The HIU connections are made on to the HIU first fix kit valve
connection tails.
These are to be connected by suitable piping diameters. Please
see table overleaf for reference.
A clearance around the unit is required of at least:
Top 100mm
Sides 20mm
Bottom of wall bracket 80mm
Front Clearance
The minimum front clearance when built into a cupboard is
25mm from the outward opening cupboard door.
600mm overall clearance is still required with a cupboard door
open, to allow for servicing.
Bottom Clearance
The bottom clearance from the underside of the wall bracket
should be a minimum of 80mm in order to allow access to the
HIU isolation valves and the CH filling loop system.
Refer to the wall mounting template for further information.
329
475
736
100
20
20
80 MIN
DCW INLET
DCW INLET
DHW OUTLET
DHW OUTLET
PRIMAR
Y
RETURN
PRIMAR
Y
RETURN
PRIMAR
Y
FLOW
PRIMAR
Y
FLOW
CH FLOW
CH FLOW
CH RETURN
CH RETURN
P
RV
CH CIRCUIT
DRAIN
FILLING LOOP
18.5
36
65
65
65
65
85
94
18.5
36
65
65
65
65
85
66
28
Direct
Indirect
Dimensions
Clearances
Содержание i305
Страница 2: ...2 Installation and Servicing...
Страница 4: ...4 Installation and Servicing...
Страница 47: ...THIS PAGE HAS BEEN LEFT INTENTIONALLY BLANK...