1.1  INTRODUCTION

The Ideal POD range are wall mounted, electronically controlled, 
Heat Interface Units (HIU) whose energy is provided from district 
or community-based heating systems. Examples of central plant 
systems include centralised HIUs, district heating or central 
energy systems using renewable or hybrid energy sources.

HIUs provide accurately controlled heating and hot water delivery 
to meet the user’s demands. These units are available with 
indirect domestic hot water and central heating (Indirect range) or 
with indirect domestic hot water and direct central heating (Direct 
range) formats.

INDIRECT RANGE

• 

Ideal POD i305 = 30kW DHW output with 5kW indirect CH 
output performance

• 

Ideal POD i405 = 40kW DHW output with 5kW indirect CH 
output performance

• 

Ideal POD i505 = 50kW DHW output with 5kW indirect CH 
output performance

• 

Ideal POD i605 = 60kW DHW output with 5kW indirect CH 
output performance

• 

Ideal POD i705 = 70kW DHW output with 5kW indirect CH 
output performance

DIRECT RANGE 

• 

Ideal POD D30 = 30kW DHW output with direct CH output 
performance

• 

Ideal POD D40 = 40kW DHW output with direct CH output 
performance

• 

Ideal POD D50 = 50kW DHW output with direct CH output 
performance

• 

Ideal POD D60 = 60kW DHW output with direct CH output 
performance

The HIU is supplied fully assembled, incorporating electronic 
controls, Primary Pressure Independent Control Valves (PICV), a 
Domestic Hot Water (DHW) Plate Heat Exchanger (PHE), shock 
arrestor, strainer, control turbine and thermistors.

Indirect units have an additional circulating pump, pressure 
gauge, safety valve and Central Heating (CH) expansion vessel.

The HIU is provided with a fully insulated heat transfer section 
reducing heat loss with an isolation connection manifold and CH 

filling loop (Indirect only).

User Features 

User controls allow the required temperatures to be selected for 
hot water and for heating.

The HIU features a DHW Preheat facility, frost protection, daily 
pump and PICV exercise.

Installer Features

• 

Primary return temperature limiting

 - this feature is 

intended to be used by commissioning engineers and 
restricts the return temperature on the primary by not opening 
the PICV to allow any more heat energy than that required 
to deliver the pre-set primary return temperature. This may 
reduce available output and ensures the heat network system 

meets its design efficiency requirement.

• 

Concrete slab drying

 - this facility allows the HIU to be 

operated at a low temperature suitable to assist the drying of 

a concrete floor where under-floor heating is installed without 

causing cracking.

• 

PICV (s) anti seize function

 - If the PICV has not operated 

in a 24 hour period the control will operate the valve briefly to 

prevent the valve from becoming stuck in position.

• 

Construction

 - the HIU casing and front door is of white 

painted mild steel, the user controls are located behind the 
lower hinged door. The internal control panel is polymer-

based construction. There is provision to fit an optional heat 

meter to record the energy consumption.

• 

All the internal plate heat exchangers are stainless steel.

• 

The central heating circuit for all models is suitable for 
connection to fully pumped, sealed heating systems ONLY.

• 

Adequate arrangements for completely draining the system 
by provision of drain cocks MUST be provided in the 
installation pipework.

• 

Pipework from the HIU can be routed upwards or 
downwards.

• 

The HIU has a separate isolation valve connection system 

and filling loop (Indirect only) that must be fitted prior to HIU 

installation.

• 

Additional kits are available to aid system flushing and filling.

• 

Be sure to follow Ideal installation and maintenance guide for 
correct method of installation.

Data Plate

The HIU model, serial number and other key operational data 
can be found on the data plate that is located inside the left-hand 
side panel of the case. 

1.2  OPERATION

The HIU operates on DHW priority. During a CH demand period 
if a DHW demand is detected the HIU will deliver the required 
DHW, returning to CH mode only when the DHW demand ends. 
The HIU has a DHW pre-heat function for a faster response 
to demand for hot water. This only operates if the “PREHEAT” 
function is selected and the display reads “HOT WATER 
PREHEAT ON”.

The delivery temperature of the DHW is controlled by the PICV. 

This controls the flow of the primary water to the DHW plate heat 

exchanger delivering the required temperature as set on the user 
control.

When there is a demand for CH, the heating system is supplied 
at the selected temperature of between 30°C and 80°C, until the 

CH demand is deactivated or there is a DHW demand. The flow 

temperature to the heating system is controlled by the heating 

circuit PICV. This controls the flow of the primary water to the 

central heating plate heat exchanger delivering the required 
temperature as set on the user control.

For DHW draw off data please reference the performance tables 
in Table 2.

The DHW draw off rate specified in Table 2 is the nominal that 

the HIU flow regulator will supply. Due to system variations and 

seasonal temperature fluctuations DHW flow rates/temperature 

rise will vary, requiring adjustment at the draw off tap.

At low DHW draw-off rates the maximum temperature may 
temporarily exceed 65ºC (i.e. for a period of less than 10 
seconds).

The HIU features a comprehensive diagnostic system which 
gives detailed information on the operational status, and 
performance of key components to aid commissioning and fault 

finding.

Содержание i305

Страница 1: ...rts that have not been clearly authorised by Ideal Heating For the very latest copy of literature for specification and maintenance practices visit our website idealheating com where you can download...

Страница 2: ...2 Installation and Servicing...

Страница 3: ...03 July 21 Updated images additional Section 3 17 Domestic Hot Water Thermistor Ideal Heating reserve the right to vary specification without notice FOR ANY TECHNICAL QUERIES PLEASE RING THE IDEAL INS...

Страница 4: ...4 Installation and Servicing...

Страница 5: ...NG 29 3 1 Servicing Schedule 29 3 2 Key Components Indirect 30 3 3 Key Components Direct 31 3 4 HIU Front Panel Removal Replacement 32 3 5 Draining The Heat Interface Unit 32 3 6 Primary Strainer Remo...

Страница 6: ...to operate at 0 6 bar system pressure bar PSI kPa 0 5 bar 7 25 50 Maximum Operational DHW Temperature dependant on primary supply C 65 C 70 C to 85 C Primary Maximum Primary Supply Pressure bar PSI k...

Страница 7: ...min 9 7 13 3 16 7 19 0 22 4 9 7 13 3 16 7 19 0 DHW Output 55 C 45K rise kW 30 7 39 9 50 6 57 9 63 4 30 7 39 9 50 6 57 9 Primary Flow Rate l s 0 16 0 21 0 26 0 29 0 32 0 16 0 21 0 26 0 29 Primary Retur...

Страница 8: ...has not operated in a 24 hour period the control will operate the valve briefly to prevent the valve from becoming stuck in position Construction the HIU casing and front door is of white painted mil...

Страница 9: ...be made to the current ETCI rules for electrical installation Detailed recommendations are contained in the following British Standard Codes of Practice CIBSE CP1 2020 Heat Network code of practice B...

Страница 10: ...le isolator and where practical replacement installations the isolator shall be situated adjacent to the appliance 0 6m Zone 0 Recessed window Zone 2 Ceiling 3G8913a 2 25m Zone 1 Compartment Installat...

Страница 11: ...25mm from the outward opening cupboard door 600mm overall clearance is still required with a cupboard door open to allow for servicing Bottom Clearance The bottom clearance from the underside of the w...

Страница 12: ...m and maximum working pressures In areas of low mains water pressures the domestic hot water regulator may be removed from the DHW flow turbine manifold Refer to Section 3 21 The HIU will require the...

Страница 13: ...the Guidance Notes on Water Treatment in Central Heating Systems If water treatment is used Ideal Heating recommend only the use of SCALEMASTER SM 1 PRO FERNOX MBI ADEY MC1 SENTINEL X100 or CALMAG CM1...

Страница 14: ...Primary Flow Pipe DHW 2 131 Primary Flow Pipe CH 1 132 Primary Flow Pipe CH 2 133 Primary Return Pipe 136 CH Flow Pipe Indirect 137 CH Return Pipe Indirect 138 CH Return PIPE Direct 139 CH Flow Pipe...

Страница 15: ...damage to the pressure relief out pipe and valve Care MUST be taken to support the appliance during lifting This should be done by 2 people due to the weight of the unit DO NOT LIFT THE APPLIANCE VIA...

Страница 16: ...horizontal c Remove brass plugs from the top of the isolation valves if used Discard any used gaskets 4 Lift the HIU onto the wall mounting plate refer to the Introduction section for safe handling a...

Страница 17: ...the dust cap from valve A and plug from the filling loop adjacent to valve A 3 Ensure top hat washers is still fitted to the valve A if not then check inside the removed dust cap 4 Connect the filling...

Страница 18: ...n section 3 12 to gain access to the Primary and CH Air Vents 2 Ensure isolation valves C D E and F are in closed position handle horizontal 3 Turn the black handle on isolation valve D so it is point...

Страница 19: ...pole switch having 3mm contact separation in both poles The means of isolation must be accessible to the user after installation WARNING This appliance MUST be earthed All electrical work within the u...

Страница 20: ...ostat has compensation and requires a neutral connection make this connection to the fused spur on the load side See Diagram C Optional External Controls Extra Low Voltage Wiring OpenTherm Room Contro...

Страница 21: ...al Turbine GND Turbine 5V WPS Signal WPS GND WPS 5V DHW Valve Q1 Q3 DHW Valve Q2 Q4 DHW Valve Q5 Q7 DHW Valve Q6 Q8 CH Valve Q1 Q3 CH Valve Q2 Q4 CH Valve Q5 Q7 CH Valve Q6 Q8 MAINS LIVE MAINS NEUTRAL...

Страница 22: ...ll the relevant parameters to provide efficient operation of the HIU and the Heat Network A B C D E F G Electrical Installation 1 Checks to ensure electrical safety should be carried out by a competen...

Страница 23: ...ed limits Note If using underfloor heating ensure CH target temperature is within the safe operating temperature for the underfloor heating Switching CH On Off Press the Menu button again to access th...

Страница 24: ...W demand the display will show the tap symbol and the DHW delivery temperature With a CH demand the display will show the radiator symbol and the CH delivery temperature If Preheat is enabled the HIU...

Страница 25: ...lowing options II Indirect indirect dI Direct indirect It N A Dt N A Press the Menu button when the correct option is selected Press the button to cycle through the following options Indirect II 30 40...

Страница 26: ...s Press the Menu button to progress to the DHW Valve Replacement service mode If buttons are pressed the DHW valve will drive fully open for up to 30 minutes This may be required if the valve body nee...

Страница 27: ...activation display Press buttons to enable disable the primary return limitation function Note This function is independent of the Credit control valve accessory behaviour Press the Menu button again...

Страница 28: ...es under the relevant national regulations 2 Explain and demonstrate the start up and shutting down procedures 3 The operation of the HIU and the use and adjustment of all system controls should be fu...

Страница 29: ...er to Section 4 fault finding as necessary Warning Always isolate all service valves switch off and disconnect the electrical supply to the appliance before servicing 5 Check the DHW filter for blocka...

Страница 30: ...rimary Return Assembly 9 Manifold DHW Flow Assembly 10 Manifold DCW Assembly 11 PICV DN20 12 PICV DN15 13 Air Vent DCW 14 Air Vent Primary 15 Air Vent CH 16 PRV 17 Auto Air Vent 18 Pump Head 19 Pressu...

Страница 31: ...t CH 7 Manifold Primary Flow Assembly 8 Manifold Primary Return Assembly 9 Manifold DHW Flow Assembly 10 Manifold DCW Assembly 11 PICV DN20 12 PICV DN15 13 Air Vent DCW 14 Air Vent Primary 15 Air Vent...

Страница 32: ...imary circuit both flow and return isolation valves MUST be isolated Failure to do this will subject the drain point to system pressure when opened and cause the full system to be drained NOTE INDIREC...

Страница 33: ...be engaged 4 Check that the HIU operates in both DHW CH modes 3 7 CH PRESSURE GAUGE REPLACEMENT INDIRECT ONLY 1 1 Isolate and drain primary circuit refer to Section 3 5 2 Refer to Section 3 4 for fron...

Страница 34: ...pansion vessel 11 Fit the new expansion vessel 12 Reassemble in reverse order ensuring the seal is in place 13 Refill the HIU and check for leaks Refer to Section 2 5 14 Check that the HIU operates in...

Страница 35: ...e HIU operates in both DHW CH modes 3 11 PUMP AUTOMATIC AIR VENT REMOVAL REPLACEMENT 1 Refer to Section 3 4 for front panel removal 2 Isolate and drain the HIU Refer to Section 3 5 3 Remove the expans...

Страница 36: ...TION FRONT SECTION REMOVAL REPLACEMENT 1 Refer to Section 3 4 for front panel removal 2 Remove harness from the insulation channel and lower down 3 Remove front insulation section by pulling forward a...

Страница 37: ...heir outlets facing left and right and the 2 x 60 elbows are fitted with their outlet facing downwards Note Failure to correctly locate the poisition of the elbows will prevent the retention clips fro...

Страница 38: ...ws are fitted with their outlet facing downwards Note Failure to correctly locate the poisition of the elbows will prevent the retention clips from being fitted 11 Ensure new retention clips are locat...

Страница 39: ...er provided 6 Reassemble in the reverse order 7 Refill the HIU Refer to Section 2 5 8 Check that the HIU operates in both DHW CH modes 1 Isolate and drain the HIU Refer to Section 3 5 2 Remove the fro...

Страница 40: ...ould be used 6 Fit the new thermistor 7 Reassemble in the reverse order 8 Refill the HIU Refer to Section 2 5 9 Check that the HIU operates in both DHW CH modes 3 17 DOMESTIC HOT WATER THERMISTOR 3 18...

Страница 41: ...and pull the PRV upward to remove it from the manifold 5 Reassemble in reverse order ensuring the retaining clip is correctly fitted the pipe compression fitting re tightened and return thermistor is...

Страница 42: ...at the mains wait for 10 seconds and power on again d Display shows F9 e Press the or button to progress to the HIU type setting screen f Using the or button the display will be able to by cycled betw...

Страница 43: ...nd drain down the HIU Refer to Section 3 5 2 Remove the front panel Refer to Section 3 4 3 Remove insulation front section Refer to Section 3 12 4 Disconnect the connector on the flow turbine harness...

Страница 44: ...the valve The unit must be then turned off at the mains and back on to allow the valve to recalibrate its position 1 Isolate the mains electrical supply 2 Remove the front panel Refer to Section 3 4...

Страница 45: ...flow filter manifold 8 Place both halves of the plastic adapter around the 3 notches of the temperature sensor 9 Press the adapter together and screw hand tight 3 5 Nm into the primary flow filter ma...

Страница 46: ...eaks 17 Activate the meter and follow the heat meter instructions provided to commission and setup the meter 18 Ensure control box cover can move freely and the front panel can be secured without trap...

Страница 47: ...THIS PAGE HAS BEEN LEFT INTENTIONALLY BLANK...

Страница 48: ...on flow thermistor and using a multi meter measure the resistance of the thermistor This should be around 10k in ambient conditions If thermistor is functioning correctly reconnect harness to flow th...

Страница 49: ...using the process as shown in Section 3 20 HOT WATER PREHEAT fp OFF Pump Failure Check system water pressure is between 1 and 1 5 bar on the system pressure gauge If system pressure is low increase th...

Страница 50: ...pplied to the HIU Replace PICV as shown in Section 3 24 NO NO NO NO YES YES YES YES No CH operation but DHW OK Is the Tap symbol shown on the display during a DHW demand Ensure the wiring between the...

Страница 51: ...ter Pressure Sensor Fault F1 No CH operation 11 DHW Sensor disconnected from pipe FC DHW Valve to closed position 51 Low Water Pressure F1 No CH operation 63 High Mains Voltage N A N A 64 Low Mains Vo...

Страница 52: ...eal Failure to do so could affect safety or performance of this appliance Comprehensive spares parts information and details of approved Ideal Parts Distributors are available on idealheating com Our...

Страница 53: ...res Has a domes c hea ng system lter been installed Yes No CENTRAL HEATING MODE measure and record for direct appliances record only primary ow return in central hea ng mode Primary di eren al pressur...

Страница 54: ...ure checked adjusted Yes CH system expansion vessel pressure checked adjusted Yes CH system ll pressure checked adjusted as necessary Yes CH system ll pressure checked adjusted as necessary Yes DHW Co...

Страница 55: ...ure checked adjusted Yes CH system expansion vessel pressure checked adjusted Yes CH system ll pressure checked adjusted as necessary Yes CH system ll pressure checked adjusted as necessary Yes DHW Co...

Страница 56: ...ufactured under an ISO 9001 registered quality management system FM 59915 At Ideal Heating we take our environmental impact seriously therefore when installing any Ideal Heating product please make su...

Отзывы: