21
Viceroy GTS -
Installation & Servicing
INSTALLATION
1
2
vic7118
26 FITTING THE CASING SUPPORTS
1.
Fix the lower casing supports to the framework using one
M8x25 bolt and lock washer for each support.
Note.
The quantity varies according to the boiler length.
27 INSTALLING THE INSULATING MATERIAL
1.
Lay the insulation panels over the boiler.
2.
Secure the insulation in place by tying each
strap to the lower casing support at each
side of the boiler.
Note.
The table below indicates the quantity of
insulation panels supplied for each boiler and
the appropriate position according to their width.
3.
Fit the rear insulation.
Note.
This will be held in place by the rear panels
when fitted later (Frame 34).
1
vic7102
HM 8x25
vic7117
Note.
For pre-assembled boilers loosen
the base frame securing bolts.
3
vis7103
Boiler Body insulation width
Front
Rear
500 500 600 800 900
GTS
8
1 1
GTS 9
1
1
1
GTS 10
1
1
1
GTS 11
1
1
1
GTS 12
1
2
1
GTS 13
1
2
1
GTS 14
1
2
1
INST
ALLA
TION
Содержание VICEROY GTS 8
Страница 34: ...34 Viceroy GTS Installation Servicing NOTES...
Страница 35: ...35 Viceroy GTS Installation Servicing NOTES...