36
Installation and Servicing
SECTION 2 - INSTALLATION
MENU
READY
TIMER OR ROOM
THERMOSTAT OFF
SERVICE DUE Ideal Boilers 01482 498660
ON
60°C
WARNING.
Whilst effecting the required gas tightness test and purging air from the gas installation,
open all windows and doors, extinguish naked lights and
DO NOT SMOKE.
A. Electrical Installation
1.
Checks to ensure electrical safety should be carried out by a
competent person.
2.
ALWAYS carry out the preliminary electrical system checks,
i.e. earth continuity, polarity, resistance to earth and short
circuit, using a suitable test meter.
3.
After wiring the boiler, all grommets in the bottom panel
MUST be in place to ensure that boiler case sealing is
maintained.
B. Gas Installation
1.
The whole of the gas installation, including the meter,
should be inspected and tested for tightness and purged in
accordance with the recommendations of BS. 6891.
In IE refer to IS.813.
2.
Purge air from the gas installation by the approved methods
only.
2.23 COMMISSIONING AND TESTING
GENERAL
Please Note
: The combustion for this appliance has
been checked, adjusted and preset at the factory for
operation on the gas type defined on the appliance
data plate.
DO NOT
adjust the air/gas ratio valve.
Having checked:
-
That the boiler has been installed in accordance
with these instructions.
- The integrity of the flue system and the flue seals,
as described in the Flue Installation section.
Proceed to put the boiler into operation as follows:
CHECK THE OPERATIONAL (WORKING) GAS
INLET PRESSURE
To set up the boiler to operate at maximum
DHW rate, open one HW tap fully or refer
to page 45, “Service Mode Maximum DHW
Rate”. This mode will operate the boiler
at maximum heat output but through the
central heating circuit. To ensure the boiler
is operating at maximum this must be
carried out when the system is cool.
With the boiler operating in the maximum
rate condition check that the operational
(working) gas pressure at the inlet gas
pressure test point complies with the
requirements - refer to Section 1.8 - Gas
Supply.
Ensure that this inlet pressure can be
obtained with all other gas appliances in
the property working.
SERVICE
When the boiler has been installed for more than 1
year a message similar to the following screen will
appear:
Gas Supply
Gas Pressure
Test Point
ATTENTION !
IT IS A CONDITION OF THE MANUFACTURERS WARRANTY THAT THE
BENCHMARK COMMISSIONING CHECKLIST IS FULLY COMPLETED
AND LEFT WITH THE APPLIANCE
As part of the commissioning process, the combustion of this appliance must be checked
and the Benchmark Checklist completed. A flow chart to assist is provided on page 79.
INST
ALLA
TION
Содержание VOGUE COMBI C32IE
Страница 4: ...4 Installation and Servicing...
Страница 6: ...6 Installation and Servicing...
Страница 74: ......