17
Minimiser
-
Installation
INSTALLATION
24 WALL MOUNTING TEMPLATE
Note.
The template shows the positions for the fixing holes and
the flue hole centres for standard installation and for using
the standoff brackets. Care MUST be taken to ensure the
correct holes are drilled.
1.
Separate the templates.
2.
Tape both templates into the selected position, locating
template B through an extended centre line as shown -
ensure that it is the right way up for the flue hand
required.
3.
Ensure squareness by hanging a plumbline as shown.
4.
Mark onto the wall the following:
a
The two wall mounting plate screw positions (choose
one from each group) and the jacking screw position.
b
The position of the flue duct hole (see diagram below,
and template)
Note.
Mark the centre of the hole as well as the circumference
5.
Remove both templates from the wall.
23 FLUE ASSEMBLY - Exploded view
Note
.
If the boiler is to be fitted flush with 300mm
kitchen units using the stand-off brackets
ensure the wall is marked to suit this
condition (the dotted flue hole outlines on
the template).
SIDE FLUE OUTLET
2.
When cutting the ducts
always use the
cardboard support
cutting aid provided.
1.
An optional flue duct extension kit is
required for wall thicknesses greater than :
698 mm (27
1/2
") for RHS flue
614 mm (24
1/8
") for LHS flue
(see Frame 14).
LEGEND
1.
Terminal
2.
Weather seal
3.
Duct assembly
4.
Angle plate
5.
Flue turret
6.
No.8 x 8 fixing screw
7.
M5 x 10 pozi screws (4)
1
2
3
7
5
6
4