Minimiser
- Installation
16
INSTALLATION
PROCEED TO FRAME 34
REAR FLUE OUTLET
21 CONNECTING THE FLUE TO THE BOILER
22 TERMINAL WALL PLATE
sealing panel
clips
Heat
exchanger
1.
Undo the three clips retaining the
boiler sealing panel.
2.
Swing the panel open to the left and
disengage it from the boiler.
3.
Fit the flue connector tube (supplied
in the hardware pack) to the top of
the heat exchanger, ensuring that
the seal is in place.
4.
Insert the flue assembly through the
hole in the wall far enough to allow
the rubber seal to unfold completely
and form an adequate seal on the
outside wall.
5.
Pull the flue back and locate the flue
turret on to the top of the boiler, sealing
between the turret and the connector tube
with the sealant provided.
6.
Secure the flue turret assembly on the top
of the boiler using four M5 x 10mm screws
provided in Pack B.
Note.
It is now necessary to make good
the inside wall face around the flue.
This plate allows neat concealment and full compression of
the rubber seal. Its use is not essential if the flue hole and
flue ducts have been accurately cut and the outside wall face
is flat.
1.
Position the terminal wall plate over the terminal.
2.
Drill 4 fixing holes with a 7mm (
1/4
") masonry drill.
3.
Insert the 4 plastic plugs provided.
4.
Secure the plate with 4 of the No.10 x 2" screws provided.
Note.
If the terminal is less than 2m (6' 6") above ground
level, an approved terminal guard should be fitted.
Refer to 'Flue Installation', Page 5.