8
Mexico Super 4100 FF & 4125 FF -
Installation
INSTALLATION
INST
ALLA
TION
3 BOILER ASSEMBLY - Exploded View
Mexico Super 4100 FF shown with casing removed.
42
38
12
14
49
41
5
1
7
Tie rod
8
46
Mex 1880
Data badge
28
16
18
30
6
69
68
2
4
3
24
47
18. Burner manifold.
24. Gas valve assy.
28. Gas cock.
30. PCB assembly.
38. Pressure switch.
41. Turret assembly.
42. Turret access cover assy.
46. Boiler base plate.
47. Baseplate heat shield.
49. Flue baffle.
68. Thermostat phial retaining clip
69. Phial split pin.
LEGEND
1. Heat exchanger assembly.
2. Front section.
3. Centre section.
4. Section alignment rings and 'O' rings.
5. Back section.
6. Thermostat pocket.
7. Distributor tube.
8. Combustion chamber.
12. Collector hood.
14. Fan assembly.
16. Front plate assy.
INST
ALLA
TION
Содержание 4100 4125
Страница 1: ......
Страница 39: ...39 SHORT LIST OF PARTS Mexico Super 4100 FF 4125 FF Installation 76 SHORT PARTS Mex 1879 ...