1.  IceBox fan(s) supplied in the FCU are as 

per the approved drawings provided. 
IceBox fan coil unit include but are not 
limited to EC plug fans as standard 
or an option for AC fans as a special 
manufacture.

2.  EC plug fans are wired to a junction box 

inside the fan section.

3.  All wiring connections shall be properly 

terminated and all conduits shall be sealed 
properly to ensure no air channeling 
through the conduit that might cause 
moisture ingression.

7.  The fan assembly should be checked 

regularly for its vibration level. 

8.  After a long period of operation during 

which the grease keeps its lubrication 
performance (30,000 h for standard 
applications), a bearing change may be 
required. For standby FCUs, during periods 
of long idling periods, the fan should be 
put to operate on regular intervals. This is 
to prevent the bearings from mechanical 
load and the avoid ingress of moisture.

9.  Any canvas connection between the 

fan and the air inlet structure should be 
periodically checked to ensure integrity. If 
damaged, a replacement will be required.

FAN SECTION

4.  The power supply cable connection shall be 

ensured correct as per the wiring label on 
the motor nameplate.

5.  For safety and the correct operation the fan 

should not exceed the recommend rotation 
speed or voltage on the nameplate.

6.  Any works to the fan section shall only be 

carried out when the unit is not operational 
and it is safe to enter the environment. 
Electrical isolation and lock out procedures 
as per relevant codes of practice.

 

ICEBOX FAN COIL UNITS IOM | 9 

Содержание PFU-45-067

Страница 1: ...F A NC O IL U N IT S Installation Operation and Maintenance Manual...

Страница 2: ...coils for cooling and heating applications the units are suitable for a wide range of commercial and industrial applications The double skin compact design provides efficiencies using electronically c...

Страница 3: ...N 10 A C C E S SD O O R SA N DP A N E L S 11 S T A N D A R DF E A T U R E S O P T IO N A LA C C E S S O R IE S 12 U N ITID E N T IF IC A T IO N 13 4R O W T E C H N IC A LP E R F O R M A N C E 14 6R O...

Страница 4: ...rsonnel It is the obligation and responsibility of the installer and operating service personnel to identify and recognize these inherent hazards protect themselves and proceed safely in completing th...

Страница 5: ...or questions PE RSO N A LSA FE TY When lifting installing or working on equipment always adhere to safety codes and guidelines PPE is required ensure safety goggles work gloves work boots and protecti...

Страница 6: ...dle to fix the position of the damper opening should it be manually operated 4 Should the damper require to be actuator operated the handle can be removed and be fixed with the damper actuators 5 Damp...

Страница 7: ...while the bag filter casing thickness is 21mm with an extended surface bag length of either 380mm or 530mm 5 The synthetic fibre filter is disposable type and needed to be serviced based on operation...

Страница 8: ...ection coating is highly recommended for such operation conditions 4 Heat exchangers will require periodic cleaning to ensure operating efficiency and longevity If coils have been treated periodical i...

Страница 9: ...may be required For standby FCUs during periods of long idling periods the fan should be put to operate on regular intervals This is to prevent the bearings from mechanical load and the avoid ingress...

Страница 10: ...water 5 The heights H1 H2 and H3 can be determined from the maximum negative pressure p and maximum pressure p in the section of the U trap or be determined by the information on the technical data sh...

Страница 11: ...ove during handling of the unit The access doors and or hinges should be realigned once in final position and the air handling unit is level 5 Please ensure handles are in the open position when closi...

Страница 12: ...ctions flanged edge or spigots can be provided to suit the installation requirements G4 Filters are standard Optional 50mm panel filters F5 F7 or 100mm V Form or bag filters with mixing box available...

Страница 13: ...N G E IceBox modular AHUs can be used for both indoor and outdoor installations with the proven ability to perform in tropical to below freezing temperatures To suit your thermal bridging requirement...

Страница 14: ...3 9 2 12 9 19 5 21 9 Water in C 80 80 80 80 80 80 Water out C 60 60 60 60 60 60 Water flow l s 0 06 0 08 0 11 0 16 0 24 0 27 Water pd kPa 2 4 11 11 30 19 Pipe conn BSP 1 2 1 2 1 2 1 2 1 2 1 2 Fan Fan...

Страница 15: ...3 9 2 12 9 19 5 21 9 Water in C 80 80 80 80 80 80 Water out C 60 60 60 60 60 60 Water flow l s 0 06 0 08 0 11 0 16 0 24 0 27 Water pd kPa 2 4 11 11 30 19 Pipe conn BSP 1 2 1 2 1 2 1 2 1 2 1 2 Fan Fan...

Страница 16: ...1P H A S EC O N N E C T IO N R E C E N TP R O JE C T 163A B B O TTS T R E E T Q U E E N S L A N D 16 IC E B O XF A N C O ILU N IT SIO M...

Страница 17: ...P F U 45 067 S ID EV IE W T O PV IE W R E C E N TP R O JE C T R E V E S B YW O R K E R SC L U B N E W S O U T HW A L E S IC E B O XF A N C O ILU N IT SIO M 17...

Страница 18: ...S ID EV IE W T O PV IE W P F U 45 079 18 IC E B O XF A N C O ILU N IT SIO M...

Страница 19: ...S ID EV IE W T O PV IE W P F U 45 102 R E C E N TP R O JE C T D H LB R IS B A N EA IR P O R T Q U E E N S L A N D IC E B O XF A N C O ILU N IT SIO M 19...

Страница 20: ...S ID EV IE W T O PV IE W P F U 45 13 5 20 IC E B O XF A N C O ILU N IT SIO M...

Страница 21: ...S ID EV IE W T O PV IE W P F U 50 163 R E C E N TP R O JE C T N O R T HW E S TP R IV A T E H O S P IT A LP H A R M A C Y Q U E E N S L A N D IC E B O XF A N C O ILU N IT SIO M 21...

Страница 22: ...S ID EV IE W T O PV IE W P F U 50 191 22 IC E B O XF A N C O ILU N IT SIO M...

Страница 23: ...S ID EV IE W T O PV IE W P F U 55 191 R E C E N TP R O JE C T C O S M O SM E D IC A LC E N T R E IC E B O XF A N C O ILU N IT SIO M 23...

Страница 24: ...perated correctly and that fans are running or are shut down in accordance with the correct operational sequence for the air handling system Inspect and clean outdoor air intakes and exhaust air disch...

Страница 25: ...O D E L T O T A LS T A T IC P a P R O JE C TN O D A T E D It is a requirement for warranty that the customer mechanical contractor has read and fully understands the manufacturers IOM Please note AHUs...

Страница 26: ...S T R A L IA G R E E N F IE L DS H O P P IN G C E N T R E N E W S O U T HW A L E S C A R L T O NC O N N E C T V IC T O R IA S T A RC A S IN O Q U E E N S L A N D P E N T R ID G EV IL L A G E V IC T O...

Отзывы: