•  Carry out the following tasks in accordance with 

AS3666, SAHB32 and the Public Health Act

•  The following tasks recommended by IceBox from 

documentation supplied by AIRAH and are indicative 
only.

•  In units with sprayed coils clean out algae and slime.

•  Carry out the following tasks in accordance with 

AS3666, SAHB32 and the Public Health Act

•  The following tasks recommended by IceBox from 

documentation supplied by AIRAH and are indicative 
only.

•  Check that appropriate indicating lights signify normal 

operation.

•  Carry out the following tasks in accordance with 

AS3666, SAHB32 and the Public Health Act

•  The following tasks recommended by IceBox from 

documentation supplied by AIRAH and are indicative 
only.

•  Check for leaks in coils and piping connections. Record 

and report any leaks.

•  - Carry out the following tasks in accordance with 

AS3666, SAHB32 and the Public Health Act

•  The following tasks recommended by IceBox from 

documentation supplied by AIRAH and are indicative 
only.

•  Inspect the casing for corrosion and leaks, record/report 

as necessary.

•  During a fire mode test (refer 3mth action) check that 

each item of equipment and any associated indicators 
have operated correctly and that fans are running or are 
shut down in accordance with the correct operational 
sequence for the air-handling system(

•  Inspect and clean outdoor air intakes and exhaust air 

discharges (outlets) where necessary

•  Inspect drain trays, ensure drains are clear, trays are 

clean and drains have a water trap in them.

•  Simulate fire/smoke situation (for each system when 

separate) to effect changeover or shutdown as 
appropriate

•  Switch system back to ‘normal’ and check that all 

equipment is in the correct designated mode.

•  Check panels, doors and fastenings for security.  Record 

and report any leaks.

•  Ensure insulation is secure, record/report as necessary.
•  Inspect flexible connections and record/report as 

necessary.

•  Remove rubbish from conditioner housing.
•  Replace defective lights.

•  During a fire mode test (refer 3mth action) check that 

motorised outside-air, recycle air, air-control and spill-air 
dampers and their associated motors are operating 
correctly.

•  During a fire mode test (refer 3mth action) check that 

operation of the manual switch provided for the fire 
brigade personnel de-energises supply-air fans.

•  The system performance criteria of zone smoke control 

systems should be verified between each zone.

1

MAINTENANCE SCHEDULE 

6

3

12

MONTHLY

MONTHLY

MONTHLY

MONTHLY

24 | ICEBOX FAN COIL UNITS IOM

Содержание PFU-45-067

Страница 1: ...F A NC O IL U N IT S Installation Operation and Maintenance Manual...

Страница 2: ...coils for cooling and heating applications the units are suitable for a wide range of commercial and industrial applications The double skin compact design provides efficiencies using electronically c...

Страница 3: ...N 10 A C C E S SD O O R SA N DP A N E L S 11 S T A N D A R DF E A T U R E S O P T IO N A LA C C E S S O R IE S 12 U N ITID E N T IF IC A T IO N 13 4R O W T E C H N IC A LP E R F O R M A N C E 14 6R O...

Страница 4: ...rsonnel It is the obligation and responsibility of the installer and operating service personnel to identify and recognize these inherent hazards protect themselves and proceed safely in completing th...

Страница 5: ...or questions PE RSO N A LSA FE TY When lifting installing or working on equipment always adhere to safety codes and guidelines PPE is required ensure safety goggles work gloves work boots and protecti...

Страница 6: ...dle to fix the position of the damper opening should it be manually operated 4 Should the damper require to be actuator operated the handle can be removed and be fixed with the damper actuators 5 Damp...

Страница 7: ...while the bag filter casing thickness is 21mm with an extended surface bag length of either 380mm or 530mm 5 The synthetic fibre filter is disposable type and needed to be serviced based on operation...

Страница 8: ...ection coating is highly recommended for such operation conditions 4 Heat exchangers will require periodic cleaning to ensure operating efficiency and longevity If coils have been treated periodical i...

Страница 9: ...may be required For standby FCUs during periods of long idling periods the fan should be put to operate on regular intervals This is to prevent the bearings from mechanical load and the avoid ingress...

Страница 10: ...water 5 The heights H1 H2 and H3 can be determined from the maximum negative pressure p and maximum pressure p in the section of the U trap or be determined by the information on the technical data sh...

Страница 11: ...ove during handling of the unit The access doors and or hinges should be realigned once in final position and the air handling unit is level 5 Please ensure handles are in the open position when closi...

Страница 12: ...ctions flanged edge or spigots can be provided to suit the installation requirements G4 Filters are standard Optional 50mm panel filters F5 F7 or 100mm V Form or bag filters with mixing box available...

Страница 13: ...N G E IceBox modular AHUs can be used for both indoor and outdoor installations with the proven ability to perform in tropical to below freezing temperatures To suit your thermal bridging requirement...

Страница 14: ...3 9 2 12 9 19 5 21 9 Water in C 80 80 80 80 80 80 Water out C 60 60 60 60 60 60 Water flow l s 0 06 0 08 0 11 0 16 0 24 0 27 Water pd kPa 2 4 11 11 30 19 Pipe conn BSP 1 2 1 2 1 2 1 2 1 2 1 2 Fan Fan...

Страница 15: ...3 9 2 12 9 19 5 21 9 Water in C 80 80 80 80 80 80 Water out C 60 60 60 60 60 60 Water flow l s 0 06 0 08 0 11 0 16 0 24 0 27 Water pd kPa 2 4 11 11 30 19 Pipe conn BSP 1 2 1 2 1 2 1 2 1 2 1 2 Fan Fan...

Страница 16: ...1P H A S EC O N N E C T IO N R E C E N TP R O JE C T 163A B B O TTS T R E E T Q U E E N S L A N D 16 IC E B O XF A N C O ILU N IT SIO M...

Страница 17: ...P F U 45 067 S ID EV IE W T O PV IE W R E C E N TP R O JE C T R E V E S B YW O R K E R SC L U B N E W S O U T HW A L E S IC E B O XF A N C O ILU N IT SIO M 17...

Страница 18: ...S ID EV IE W T O PV IE W P F U 45 079 18 IC E B O XF A N C O ILU N IT SIO M...

Страница 19: ...S ID EV IE W T O PV IE W P F U 45 102 R E C E N TP R O JE C T D H LB R IS B A N EA IR P O R T Q U E E N S L A N D IC E B O XF A N C O ILU N IT SIO M 19...

Страница 20: ...S ID EV IE W T O PV IE W P F U 45 13 5 20 IC E B O XF A N C O ILU N IT SIO M...

Страница 21: ...S ID EV IE W T O PV IE W P F U 50 163 R E C E N TP R O JE C T N O R T HW E S TP R IV A T E H O S P IT A LP H A R M A C Y Q U E E N S L A N D IC E B O XF A N C O ILU N IT SIO M 21...

Страница 22: ...S ID EV IE W T O PV IE W P F U 50 191 22 IC E B O XF A N C O ILU N IT SIO M...

Страница 23: ...S ID EV IE W T O PV IE W P F U 55 191 R E C E N TP R O JE C T C O S M O SM E D IC A LC E N T R E IC E B O XF A N C O ILU N IT SIO M 23...

Страница 24: ...perated correctly and that fans are running or are shut down in accordance with the correct operational sequence for the air handling system Inspect and clean outdoor air intakes and exhaust air disch...

Страница 25: ...O D E L T O T A LS T A T IC P a P R O JE C TN O D A T E D It is a requirement for warranty that the customer mechanical contractor has read and fully understands the manufacturers IOM Please note AHUs...

Страница 26: ...S T R A L IA G R E E N F IE L DS H O P P IN G C E N T R E N E W S O U T HW A L E S C A R L T O NC O N N E C T V IC T O R IA S T A RC A S IN O Q U E E N S L A N D P E N T R ID G EV IL L A G E V IC T O...

Отзывы: