1.  IceBox FCUs are not always supplied with 

filters or frames. This is depending on the 
order, please check the approved drawings 
or contract our office if in doubt.

2.  The filter frames are generally supplied as 

galvanized steel frames unless otherwise 
requested. It is internally lined with a 
gasket. When the filter is compressed on 
the gasket, it provides a seal for the filters 
to minimize air from bypassing the filters. 
Four metal clips are used on each side of 
the filter frame to hold and compress the 
filters on to the filter frame. Each clip shall 
be properly engaged onto the filter frame 
after each service of the filters.

3.  There are the possibility of two standard 

off the shelf filter frame sizes. One being 
full size and the other in half size. These 
standard sizes are widely used in the 
general filter industry. The full size filter 
actual dimension is 595x595mm while 
the half size filter actual dimension is 
290x595mm.

4.  The synthetic fibre filter casing thickness is 

47mm while the bag filter casing thickness 
is 21mm with an extended surface bag 
length of either 380mm or 530mm.

5.  The synthetic fibre filter is disposable 

type and needed to be serviced based 
on operational requirement. The synthetic 
fibre filter may deform over time requiring 
replacement

6.  A lack of maintenance might cause 

clogging on the filter and will subsequently 
reduce the AHU air flow rate.

7.  The bag filter should be replaced in 

accordance with the site requirements.

8.  The bag filter is used to filter fine dust 

that might not be visible through normal 
vision. If not serviced regularly, it could 
cause reduction in AHU air flow rate. If 
not serviced for a period of time, the risk 
of damage to the integrity of the panel 
structure of the AHU due to high negative 
section pressure created by the fan due to 
clogged filters.

9.  Filters should be monitored by an 

appropriate device to determine when 
replacement or cleaning is required.

10. The recommended final pressure drop limit 

shall be 200Pa for synthetic fibre filter and 
a limit of 300Pa limit for bag filter.

FILTERS AND FRAMES

 

PANEL AND BAG FILTERS

BAG FILTERS

ICEBOX FAN COIL UNITS IOM | 7 

Содержание PFU-45-067

Страница 1: ...F A NC O IL U N IT S Installation Operation and Maintenance Manual...

Страница 2: ...coils for cooling and heating applications the units are suitable for a wide range of commercial and industrial applications The double skin compact design provides efficiencies using electronically c...

Страница 3: ...N 10 A C C E S SD O O R SA N DP A N E L S 11 S T A N D A R DF E A T U R E S O P T IO N A LA C C E S S O R IE S 12 U N ITID E N T IF IC A T IO N 13 4R O W T E C H N IC A LP E R F O R M A N C E 14 6R O...

Страница 4: ...rsonnel It is the obligation and responsibility of the installer and operating service personnel to identify and recognize these inherent hazards protect themselves and proceed safely in completing th...

Страница 5: ...or questions PE RSO N A LSA FE TY When lifting installing or working on equipment always adhere to safety codes and guidelines PPE is required ensure safety goggles work gloves work boots and protecti...

Страница 6: ...dle to fix the position of the damper opening should it be manually operated 4 Should the damper require to be actuator operated the handle can be removed and be fixed with the damper actuators 5 Damp...

Страница 7: ...while the bag filter casing thickness is 21mm with an extended surface bag length of either 380mm or 530mm 5 The synthetic fibre filter is disposable type and needed to be serviced based on operation...

Страница 8: ...ection coating is highly recommended for such operation conditions 4 Heat exchangers will require periodic cleaning to ensure operating efficiency and longevity If coils have been treated periodical i...

Страница 9: ...may be required For standby FCUs during periods of long idling periods the fan should be put to operate on regular intervals This is to prevent the bearings from mechanical load and the avoid ingress...

Страница 10: ...water 5 The heights H1 H2 and H3 can be determined from the maximum negative pressure p and maximum pressure p in the section of the U trap or be determined by the information on the technical data sh...

Страница 11: ...ove during handling of the unit The access doors and or hinges should be realigned once in final position and the air handling unit is level 5 Please ensure handles are in the open position when closi...

Страница 12: ...ctions flanged edge or spigots can be provided to suit the installation requirements G4 Filters are standard Optional 50mm panel filters F5 F7 or 100mm V Form or bag filters with mixing box available...

Страница 13: ...N G E IceBox modular AHUs can be used for both indoor and outdoor installations with the proven ability to perform in tropical to below freezing temperatures To suit your thermal bridging requirement...

Страница 14: ...3 9 2 12 9 19 5 21 9 Water in C 80 80 80 80 80 80 Water out C 60 60 60 60 60 60 Water flow l s 0 06 0 08 0 11 0 16 0 24 0 27 Water pd kPa 2 4 11 11 30 19 Pipe conn BSP 1 2 1 2 1 2 1 2 1 2 1 2 Fan Fan...

Страница 15: ...3 9 2 12 9 19 5 21 9 Water in C 80 80 80 80 80 80 Water out C 60 60 60 60 60 60 Water flow l s 0 06 0 08 0 11 0 16 0 24 0 27 Water pd kPa 2 4 11 11 30 19 Pipe conn BSP 1 2 1 2 1 2 1 2 1 2 1 2 Fan Fan...

Страница 16: ...1P H A S EC O N N E C T IO N R E C E N TP R O JE C T 163A B B O TTS T R E E T Q U E E N S L A N D 16 IC E B O XF A N C O ILU N IT SIO M...

Страница 17: ...P F U 45 067 S ID EV IE W T O PV IE W R E C E N TP R O JE C T R E V E S B YW O R K E R SC L U B N E W S O U T HW A L E S IC E B O XF A N C O ILU N IT SIO M 17...

Страница 18: ...S ID EV IE W T O PV IE W P F U 45 079 18 IC E B O XF A N C O ILU N IT SIO M...

Страница 19: ...S ID EV IE W T O PV IE W P F U 45 102 R E C E N TP R O JE C T D H LB R IS B A N EA IR P O R T Q U E E N S L A N D IC E B O XF A N C O ILU N IT SIO M 19...

Страница 20: ...S ID EV IE W T O PV IE W P F U 45 13 5 20 IC E B O XF A N C O ILU N IT SIO M...

Страница 21: ...S ID EV IE W T O PV IE W P F U 50 163 R E C E N TP R O JE C T N O R T HW E S TP R IV A T E H O S P IT A LP H A R M A C Y Q U E E N S L A N D IC E B O XF A N C O ILU N IT SIO M 21...

Страница 22: ...S ID EV IE W T O PV IE W P F U 50 191 22 IC E B O XF A N C O ILU N IT SIO M...

Страница 23: ...S ID EV IE W T O PV IE W P F U 55 191 R E C E N TP R O JE C T C O S M O SM E D IC A LC E N T R E IC E B O XF A N C O ILU N IT SIO M 23...

Страница 24: ...perated correctly and that fans are running or are shut down in accordance with the correct operational sequence for the air handling system Inspect and clean outdoor air intakes and exhaust air disch...

Страница 25: ...O D E L T O T A LS T A T IC P a P R O JE C TN O D A T E D It is a requirement for warranty that the customer mechanical contractor has read and fully understands the manufacturers IOM Please note AHUs...

Страница 26: ...S T R A L IA G R E E N F IE L DS H O P P IN G C E N T R E N E W S O U T HW A L E S C A R L T O NC O N N E C T V IC T O R IA S T A RC A S IN O Q U E E N S L A N D P E N T R ID G EV IL L A G E V IC T O...