GENERAL SAFETY  

GUIDELINES

INTENDED USE

WARRANTY OF THE  

PRODUCT

IceBox fan coil units are a custom designed and built product to suit  
particular project requirements and are supplied in accordance with the 
approved construction drawings.

This operation manual is intended for use by rigging sub-contractors, 
installing contractor and service personnel working on the IceBox units. 
Failure to comply with any of these requirements could result in serious 
damage to the equipment, the property in which it is installed, as well as 
severe personal injury or death to themselves and people at the site. It 
is expected that the personnel installing or servicing the IceBox units are 
qualified accordingly to enable the individual to perform the assigned 
tasks properly and safely. It is essential that, prior to performing any 
task on this equipment, this individual shall have read and understood 
the on-product labels, this document and any referenced materials. The 
individual shall also be familiar with and comply with all applicable 
industry and governmental standards and any regulations pertaining to 
the task in question.

During rigging, installation, operation, maintenance and service of the 
IceBox units, an individual may be exposed to certain components or 
conditions including, but not limited to: heavy objects, materials under 
pressure, rotating components and electrical voltage. Each of these items 
has the potential, if misused or handled improperly, to cause serious 
damage to property, equipment or personnel. It is the obligation and 
responsibility of the installer and operating service personnel to identify 
and recognize these inherent hazards, protect themselves, and proceed 
safely in completing their tasks.

IceBox units are manufactured to create a desired indoor air quality, air 
temperature, humidity or to filter normal or contaminated air. 

IceBox units are suitable for both indoor or outdoor operation, in a 
temperature range from -20.0°C to +60.0°C and for the supplied air 
conditions from -20.0°C to +45.0°C. Any operation outside of these 
conditions must be agreed in writing by Oceania Solutions Group.

Any additional changes to the supplied equipment of third party 
components will be the responsibility of the individual or company whom 
installed them, not Oceania Solutions Group.

IceBox units are supplied with a 12 month warranty on parts. A labour 
and parts warranty can be obtained at the time of purchasing the units. 
Please contact your local IceBox agent for details.

The warranty can be null and void if any modifications are carried out 
without prior written approval from Oceania Solutions Group for the 
IceBox units.

For the parts warranty to be upheld, the following conditions must be 
satisfied:

1.  All of the scheduled maintenance and operations detailed in this 

manual must be performed at the specified times by suitably trained 
and qualified service personnel.

2.  Only genuine and approved spare parts by Oceania Solutions 

Group must be used. Please contact Oceania Solutions Group or 
your local IceBox agent for details.

3.  Failure to satisfy any of these conditions will automatically void the 

warranty.

A full copy of our terms and conditions of warranty is available on our 
website.

4 | ICEBOX FAN COIL UNITS IOM

Содержание PFU-45-067

Страница 1: ...F A NC O IL U N IT S Installation Operation and Maintenance Manual...

Страница 2: ...coils for cooling and heating applications the units are suitable for a wide range of commercial and industrial applications The double skin compact design provides efficiencies using electronically c...

Страница 3: ...N 10 A C C E S SD O O R SA N DP A N E L S 11 S T A N D A R DF E A T U R E S O P T IO N A LA C C E S S O R IE S 12 U N ITID E N T IF IC A T IO N 13 4R O W T E C H N IC A LP E R F O R M A N C E 14 6R O...

Страница 4: ...rsonnel It is the obligation and responsibility of the installer and operating service personnel to identify and recognize these inherent hazards protect themselves and proceed safely in completing th...

Страница 5: ...or questions PE RSO N A LSA FE TY When lifting installing or working on equipment always adhere to safety codes and guidelines PPE is required ensure safety goggles work gloves work boots and protecti...

Страница 6: ...dle to fix the position of the damper opening should it be manually operated 4 Should the damper require to be actuator operated the handle can be removed and be fixed with the damper actuators 5 Damp...

Страница 7: ...while the bag filter casing thickness is 21mm with an extended surface bag length of either 380mm or 530mm 5 The synthetic fibre filter is disposable type and needed to be serviced based on operation...

Страница 8: ...ection coating is highly recommended for such operation conditions 4 Heat exchangers will require periodic cleaning to ensure operating efficiency and longevity If coils have been treated periodical i...

Страница 9: ...may be required For standby FCUs during periods of long idling periods the fan should be put to operate on regular intervals This is to prevent the bearings from mechanical load and the avoid ingress...

Страница 10: ...water 5 The heights H1 H2 and H3 can be determined from the maximum negative pressure p and maximum pressure p in the section of the U trap or be determined by the information on the technical data sh...

Страница 11: ...ove during handling of the unit The access doors and or hinges should be realigned once in final position and the air handling unit is level 5 Please ensure handles are in the open position when closi...

Страница 12: ...ctions flanged edge or spigots can be provided to suit the installation requirements G4 Filters are standard Optional 50mm panel filters F5 F7 or 100mm V Form or bag filters with mixing box available...

Страница 13: ...N G E IceBox modular AHUs can be used for both indoor and outdoor installations with the proven ability to perform in tropical to below freezing temperatures To suit your thermal bridging requirement...

Страница 14: ...3 9 2 12 9 19 5 21 9 Water in C 80 80 80 80 80 80 Water out C 60 60 60 60 60 60 Water flow l s 0 06 0 08 0 11 0 16 0 24 0 27 Water pd kPa 2 4 11 11 30 19 Pipe conn BSP 1 2 1 2 1 2 1 2 1 2 1 2 Fan Fan...

Страница 15: ...3 9 2 12 9 19 5 21 9 Water in C 80 80 80 80 80 80 Water out C 60 60 60 60 60 60 Water flow l s 0 06 0 08 0 11 0 16 0 24 0 27 Water pd kPa 2 4 11 11 30 19 Pipe conn BSP 1 2 1 2 1 2 1 2 1 2 1 2 Fan Fan...

Страница 16: ...1P H A S EC O N N E C T IO N R E C E N TP R O JE C T 163A B B O TTS T R E E T Q U E E N S L A N D 16 IC E B O XF A N C O ILU N IT SIO M...

Страница 17: ...P F U 45 067 S ID EV IE W T O PV IE W R E C E N TP R O JE C T R E V E S B YW O R K E R SC L U B N E W S O U T HW A L E S IC E B O XF A N C O ILU N IT SIO M 17...

Страница 18: ...S ID EV IE W T O PV IE W P F U 45 079 18 IC E B O XF A N C O ILU N IT SIO M...

Страница 19: ...S ID EV IE W T O PV IE W P F U 45 102 R E C E N TP R O JE C T D H LB R IS B A N EA IR P O R T Q U E E N S L A N D IC E B O XF A N C O ILU N IT SIO M 19...

Страница 20: ...S ID EV IE W T O PV IE W P F U 45 13 5 20 IC E B O XF A N C O ILU N IT SIO M...

Страница 21: ...S ID EV IE W T O PV IE W P F U 50 163 R E C E N TP R O JE C T N O R T HW E S TP R IV A T E H O S P IT A LP H A R M A C Y Q U E E N S L A N D IC E B O XF A N C O ILU N IT SIO M 21...

Страница 22: ...S ID EV IE W T O PV IE W P F U 50 191 22 IC E B O XF A N C O ILU N IT SIO M...

Страница 23: ...S ID EV IE W T O PV IE W P F U 55 191 R E C E N TP R O JE C T C O S M O SM E D IC A LC E N T R E IC E B O XF A N C O ILU N IT SIO M 23...

Страница 24: ...perated correctly and that fans are running or are shut down in accordance with the correct operational sequence for the air handling system Inspect and clean outdoor air intakes and exhaust air disch...

Страница 25: ...O D E L T O T A LS T A T IC P a P R O JE C TN O D A T E D It is a requirement for warranty that the customer mechanical contractor has read and fully understands the manufacturers IOM Please note AHUs...

Страница 26: ...S T R A L IA G R E E N F IE L DS H O P P IN G C E N T R E N E W S O U T HW A L E S C A R L T O NC O N N E C T V IC T O R IA S T A RC A S IN O Q U E E N S L A N D P E N T R ID G EV IL L A G E V IC T O...

Отзывы: