might
involve
clearing
cache
memory
on
the
RAID
controller
that
contains
the
battery
that
needs
to
be
replaced.
This
is
done
by
either
placing
the
controller
offline
before
removing
it
from
the
DS4100
server
or
turning
off
caching
in
the
DS4100
server,
using
the
DS4000
Storage
Manager
client.
Follow
the
steps
given
in
the
software
procedure
before
you
continue
with
this
procedure.
Attention:
When
you
handle
static-sensitive
devices,
take
precautions
to
avoid
damage
from
static
electricity.
For
details
about
handling
static-sensitive
devices,
see
“Handling
static-sensitive
devices”
on
page
79.
2.
Unpack
the
new
battery.
Set
the
new
battery
on
a
dry,
level
surface.
Save
all
packing
materials
in
case
you
need
to
return
the
battery.
Note:
The
battery
comes
with
a
new
battery
label.
You
will
need
this
label
later
in
the
procedure.
3.
Review
all
documentation
that
comes
with
the
new
battery
for
updated
replacement
procedures
and
other
information.
4.
Use
the
DS4000
Storage
Manager
client
to
locate
the
RAID
controller
that
contains
the
failed
battery
(the
RAID
controller
Fault
LED
might
be
on).
Attention:
On
the
DS4100
single-controller
storage
server,
you
cannot
place
the
controller
offline.
Instead,
you
must
power
down
the
DS4100
storage
server.
For
more
information
on
preparation
tasks,
see
the
Important
note
in
the
beginning
of
this
section.
5.
Label
each
cable
that
connects
to
the
RAID
controller
that
contains
the
battery
that
has
failed.
This
ensures
that
all
cables
will
be
properly
reconnected
to
the
RAID
controller
after
you
replace
the
battery.
6.
Use
the
storage
management
software
to
take
offline
the
RAID
controller
that
contains
the
battery
that
has
failed.
Attention:
To
prevent
data
loss,
you
must
shutdown
the
system
before
you
can
replace
the
RAID
controller
battery.
For
the
proper
shutdown
sequence,
see
“Turning
off
the
storage
server”
on
page
67.
7.
Remove
the
fibre-channel
cables
and
the
SFPs
from
the
RAID
controller
that
contains
the
battery
that
has
failed
or
is
nearing
its
expiration
date.
For
more
information,
see
“Working
with
SFPs
and
fiber-optic
cables”
on
page
45.
8.
Remove
the
RAID
controller
as
described
in
“Replacing
a
RAID
controller”
on
page
96.
9.
To
remove
the
cache
battery,
place
the
RAID
controller
CRU
bottom
up
on
a
flat
surface.
Using
a
#2
Phillips
head
screwdriver,
remove
the
six
screws
(three
on
each
side
of
the
RAID
controller)
that
hold
the
RAID
controller
bottom
panel
to
the
sides
of
the
RAID
controller,
as
shown
in
Figure
75
on
page
99.
10.
Slide
the
RAID
controller
bottom
panel
away
from
the
front
side
of
the
RAID
controller
(away
from
the
SFP
slots
and
black
center
latch)
to
unlatch
it
from
the
side
panels.
11.
Carefully
flip
over
the
RAID
controller
bottom
panel.
Disconnect
the
battery
harness
on
the
battery
from
the
two-pin
connector
on
the
controller
board
as
shown
in
Figure
76
on
page
100.
12.
Remove
the
screw
that
holds
the
battery
access
panel.
Carefully
slide
the
access
panel
toward
the
front
to
unlatch
it
from
the
three
pins
mounted
on
the
RAID
controller
bottom
panel.
13.
Remove
the
battery
unit
and
place
it
on
a
dry,
level
surface.
If
this
battery
is
a
replacement
battery,
then
replace
the
old
battery
with
the
new
one.
14.
Write
the
battery
replacement
information
on
the
label
on
the
battery
pack.
106
IBM
TotalStorage
DS4100
Storage
Server:
Installation,
User’s,
and
Maintenance
Guide
Содержание TotalStorage DS4100
Страница 1: ...IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide GC26 7712 00...
Страница 2: ......
Страница 3: ...IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide GC26 7712 00...
Страница 10: ...viii IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide...
Страница 18: ...xvi IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide...
Страница 32: ...xxx IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide...
Страница 76: ...44 IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide...
Страница 96: ...64 IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide...
Страница 109: ...Battery LED f10ug037 Figure 61 Battery LED Chapter 4 Operating the storage server 77...
Страница 110: ...78 IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide...
Страница 150: ...118 IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide...
Страница 152: ...120 IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide...
Страница 156: ...124 IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide...
Страница 172: ...140 IBM TotalStorage DS4100 Storage Server Installation User s and Maintenance Guide...
Страница 179: ......
Страница 180: ...Part Number 25R0314 Printed in USA GC26 7712 00 1P P N 25R0314...