Routing
the
cables
through
the
cable-management
arm
__
Route
the
cables
through
the
hooks
along
the
cable-management
arm
and
secure
them
with
the
straps
provided.
__
After
attaching
the
cables
to
the
cable-management
arm,
go
to
the
front
of
the
rack
and
move
the
system
drawer
in
and
out.
Observe
cables
and
cable-management-arm
movement
to
verify
that
the
cables
are
not
binding.
56
System
i
and
System
p:
Cabling
your
server
Содержание System p Series
Страница 1: ...System i and System p Cabling your server ...
Страница 2: ......
Страница 3: ...System i and System p Cabling your server ...
Страница 6: ...iv System i and System p Cabling your server ...
Страница 173: ...Figure 8 Back views of a model 9405 520 or 9406 520 with the integrated HSL RIO ports T3 T4 Cabling your server 167 ...
Страница 181: ...Figure 19 Back views of a model 9111 520 server with the integrated HSL RIO ports T3 T4 Cabling your server 175 ...
Страница 193: ......
Страница 194: ... Printed in USA ...