Table 7. Common installation SRCs
SRC
Error description
Recovery steps
1000xxx
1100xxx
509Axxx
509Dxxx
50A4xxx
50ADxxx
50B1xxx
ac input and power supply
connections
1.
Verify that line cords are plugged in correctly in the
following locations:
v
Drawer
v
Power distribution unit (PDU), if applicable
v
Battery backup unit (BBU), if applicable
v
Input source power receptacle
2.
Verify that the power supplies are seated and latched
into position.
11002613
Your power voltages do not
match
Ensure that you are using the correct power voltage.
Refer to your server's specifications to learn more about
the power voltage that your server requires.
Starts with 27xxx,
28xx, 57xxx
and ends with
xxxx3120, xxxx3121
Fibre Channel port failure
These errors are often caused by ports that are not used.
Every port must have a cable or wrap plug installed.
Whenever a cable is not installed, ensure a wrap plug is
installed for each unused port. Wrap plugs are shipped
automatically when a Fibre Channel feature code is
ordered.
B1A38B24
Network configuration
Ensure that you have entered the correct IP address.
Best practices for integrating cable and system placement
These guidelines ensure that your system and its cables have optimal clearance for maintenance and
other operations. The guidelines also provide guidance for correctly cabling your system and using the
appropriate cables.
The following guidelines provide cabling information for installing, migrating, relocating, or upgrading
your system:
v
Position drawers in racks to allow enough space, where possible, for cable routing on the bottom and
top of the rack, and between drawers.
v
Shorter drawers are not be placed between longer drawers in the rack (for example, placing a 19-inch
drawer between two 24-inch drawers).
v
When a specific cable plugging sequence is required, for example, for concurrent maintenance
(symmetric multiprocessing cables), label the cables appropriately and note the sequence order.
v
To facilitate cable routing, install cables in the following order:
1.
System power control network (SPCN) cables
2.
Power cables
3.
Communications (serial-attached SCSI, InfiniBand, remote input/output, and peripheral component
interconnect express) cables
Note:
Install and route the communications cables, starting with the smallest diameter first and
then progressing to the largest diameter. This applies to installing them into the cable management
arm and retaining them to the rack, brackets, and other features that may be provided for cable
management.
v
Install and route the communications cables, starting with smallest diameter first and then progressing
to the largest diameter.
v
Use the innermost cable-management bridge lances for SPCN cables.
32
Installing the IBM PowerLinux 7R2 (8246-L2D or 8246-L2T)
Содержание PowerLinux 7R2
Страница 1: ...Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T GI11 9888 01...
Страница 2: ......
Страница 3: ...Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T GI11 9888 01...
Страница 6: ...iv Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T...
Страница 36: ...24 Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T...
Страница 57: ......
Страница 58: ...Part Number 00L5074 Printed in USA GI11 9888 01 1P P N 00L5074...