Marking the location
You might need to mark the installation location. Use this procedure to perform this task.
To mark the installation location and install the nut clips into a rack, complete the following steps:
1.
Facing the front of the rack and working from the right side, locate the bottom EIA unit that your
system will use. Make a note of the EIA location. Use tape, a marker, or a pencil to mark the bottom
hole of this EIA unit as
A
. Mark the rack so that the mark can also be seen from the rear of the rack,
as shown in Figure 2 on page 5.
Figure 1. Removing the filler panels
4
Installing the IBM PowerLinux 7R2 (8246-L2D or 8246-L2T)
Содержание PowerLinux 7R2
Страница 1: ...Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T GI11 9888 01...
Страница 2: ......
Страница 3: ...Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T GI11 9888 01...
Страница 6: ...iv Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T...
Страница 36: ...24 Installing the IBM PowerLinux 7R2 8246 L2D or 8246 L2T...
Страница 57: ......
Страница 58: ...Part Number 00L5074 Printed in USA GI11 9888 01 1P P N 00L5074...