Figure 10. Connecting the power cords
7. When the service processor comes up to the standby state (the power-on LED on the control panel is
flashing slowly), continue to the next step.
8. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm).
9. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/
POWER9/p9haj/crustartsys.htm).
10. Verify the installed part.
• If you replaced the part because of a service action, verify the installed part. For instructions, see
Verifying a repair (www.ibm.com/support/knowledgecenter/POWER9/p9ect/
pxect_verifyrepair.htm).
• If you installed the part for any other reason, verify the installed part. For instructions, see Verifying
the installed part (www.ibm.com/support/knowledgecenter/POWER9/p9haj/pxhaj_hsmverify.htm).
Trusted platform module card for the 5105-22E, 9008-22L, 9009-22A, 9009-22G, 9223-22H, or 9223-22S 13
Содержание Power System L922
Страница 4: ...iv...
Страница 14: ...xiv Power Systems Trusted platform module...
Страница 16: ...Figure 1 Removing the power cords L003 or or 2 Power Systems Trusted platform module...
Страница 28: ...14 Power Systems Trusted platform module...
Страница 39: ......
Страница 40: ...IBM...