This
illustration
shows
that
the
I/O
cables
route
upward
out
of
the
I/O
cage,
across
the
top
of
the
cage,
down
through
three
cable
guides,
and
out
through
the
tailgate.
Rear View
Front View
Input/Output
Cable Area
Figure
6-2.
Fiber
Optic
Cable
Routing
Level
04a,
June
21,
2004
6-4
zSeries
800:
Installation
Manual
for
Physical
Planning
Содержание 800
Страница 1: ...zSeries 800 Installation Manual for Physical Planning 2066 IMPP 04 Level 04a June 21 2004 ERserver ...
Страница 2: ......
Страница 3: ...zSeries 800 Installation Manual for Physical Planning 2066 IMPP 04 Level 04a June 21 2004 ERserver ...
Страница 8: ...Level 04a June 21 2004 vi zSeries 800 Installation Manual for Physical Planning ...
Страница 10: ...Level 04a June 21 2004 viii zSeries 800 Installation Manual for Physical Planning ...
Страница 12: ...Level 04a June 21 2004 x zSeries 800 Installation Manual for Physical Planning ...
Страница 16: ...Level 04a June 21 2004 xiv zSeries 800 Installation Manual for Physical Planning ...
Страница 22: ...Level 04a June 21 2004 1 4 zSeries 800 Installation Manual for Physical Planning ...
Страница 38: ...Level 04a June 21 2004 3 6 zSeries 800 Installation Manual for Physical Planning ...
Страница 52: ...Level 04a June 21 2004 4 14 zSeries 800 Installation Manual for Physical Planning ...
Страница 82: ...Level 04a June 21 2004 A 2 zSeries 800 Installation Manual for Physical Planning ...
Страница 84: ...Level 04a June 21 2004 B 2 zSeries 800 Installation Manual for Physical Planning ...
Страница 86: ...Level 04a June 21 2004 C 2 zSeries 800 Installation Manual for Physical Planning ...
Страница 90: ...Level 04a June 21 2004 D 4 zSeries 800 Installation Manual for Physical Planning ...
Страница 97: ......
Страница 98: ... Level 04a June 21 2004 Printed in USA 2066 IMPP 04 ...