ICB-3
cables
connect
between
two
zSeries
systems.
Note
that,
for
each
pair
of
ICB
features,
you
order
only
one
ICB
cable,
(FC
0227).
Input port from one of the two STI
connectors on the processor
Output port to a
z900/z800 system
Output port to a
z900/z800 system
ICB-3
Integrated Cluster Bus - 3
ICB
cables
are
NOT
supplied
under
the
Fiber
Cabling
Service
offering.
They
must
be
ordered,
the
same
as
other
optional
features.
Preparing
Configuration
Definition
The
customer
is
responsible
for
preparing
a
definition
of
the
I/O
configuration
for
the
new
processor.
You
should
use
the
CHPID
report
from
the
Configurator
as
a
guide
for
planning
and
defining
the
new
configuration.
Depending
on
the
current
operating
environment
there
may
be
several
methods
for
accomplishing
this.
z/VM
®
If
you
use
HCM
and
HCD,
develop
the
configuration
using
HCM
and
HCD.
Otherwise,
develop
the
IOCP
statements
necessary
to
define
your
configuration
and
use
the
level
of
the
ICP
IOCP
program
that
supports
the
new
processor
to
verify
the
input
statements.
You
do
not
need
to
initially
assign
PCHID
values
to
the
channel
paths
in
your
configuration.
You
can
use
the
CHPID
Mapping
Tool,
available
from
Resource
Link,
to
aid
you
in
assigning
PCHIDs
to
CHPIDs.
HCM
and
HCD
users
must
build
an
IOCP
input
data
set
from
a
validated
work
IODF
and
use
this
as
input
to
the
CHPID
Mapping
Tool.
The
CHPID
Mapping
Tool
updates
the
IOCP
input
and
assigns
PCHIDs
to
the
CHPIDs.
Note:
An
IOCP
input
file
that
was
created
by
HCM
and
HCD
without
PCHIDs
must
be
migrated
back
into
HCM
and
HCD
after
PCHID
numbers
have
been
added
to
the
file
by
the
CHPID
Mapping
Tool.
An
IOCDS
can
then
be
written
from
a
production
IODF
or
IOCP
statements
can
be
built
for
the
install
diskette.
If
upgrading
from
a
2064
z900
model
at
EC
J10638
or
later,
use
the
″
Write
IOCDS
in
Preparation
for
an
Upgrade
″
option
in
HCD
from
a
production
IODF,
or
the
Level
04a,
June
21,
2004
6-20
zSeries
800:
Installation
Manual
for
Physical
Planning
|
|
|
|
|
|
Содержание 800
Страница 1: ...zSeries 800 Installation Manual for Physical Planning 2066 IMPP 04 Level 04a June 21 2004 ERserver ...
Страница 2: ......
Страница 3: ...zSeries 800 Installation Manual for Physical Planning 2066 IMPP 04 Level 04a June 21 2004 ERserver ...
Страница 8: ...Level 04a June 21 2004 vi zSeries 800 Installation Manual for Physical Planning ...
Страница 10: ...Level 04a June 21 2004 viii zSeries 800 Installation Manual for Physical Planning ...
Страница 12: ...Level 04a June 21 2004 x zSeries 800 Installation Manual for Physical Planning ...
Страница 16: ...Level 04a June 21 2004 xiv zSeries 800 Installation Manual for Physical Planning ...
Страница 22: ...Level 04a June 21 2004 1 4 zSeries 800 Installation Manual for Physical Planning ...
Страница 38: ...Level 04a June 21 2004 3 6 zSeries 800 Installation Manual for Physical Planning ...
Страница 52: ...Level 04a June 21 2004 4 14 zSeries 800 Installation Manual for Physical Planning ...
Страница 82: ...Level 04a June 21 2004 A 2 zSeries 800 Installation Manual for Physical Planning ...
Страница 84: ...Level 04a June 21 2004 B 2 zSeries 800 Installation Manual for Physical Planning ...
Страница 86: ...Level 04a June 21 2004 C 2 zSeries 800 Installation Manual for Physical Planning ...
Страница 90: ...Level 04a June 21 2004 D 4 zSeries 800 Installation Manual for Physical Planning ...
Страница 97: ......
Страница 98: ... Level 04a June 21 2004 Printed in USA 2066 IMPP 04 ...