The
system
requires
specific
service
clearances
to
insure
the
fastest
possible
repair
in
the
unlikely
event
that
a
part
may
need
to
be
replaced.
Failure
to
provide
enough
clearance
to
open
the
front,
rear,
left,
and
right
side
covers
will
result
in
extended
service
time.
Machine
and
Service
Clearance
Areas
Machine
area
is
the
actual
floor
space
covered
by
the
system.
Service
clearance
area
includes
the
machine
area,
plus
additional
space
required
to
open
the
covers
for
service
access
to
the
system.
For
the
zSeries
800
system,
machine
area
is
0.83
M
2
(8.9
ft
2
),
and
the
service
clearance
area
is
5.99
M
2
(64.5
ft
2
).
Notes:
1.
Machine
area
includes
installed
covers.
2.
Service
clearance
area
must
be
free
of
all
obstacles.
Units
must
be
placed
in
a
way
that
all
service
areas
are
accessible.
The
weight
distribution
clearance
area
extending
beyond
the
service
clearance
area,
such
as
the
area
at
the
outside
corners
of
the
units,
may
contain
support
walls
and
columns.
Cooling
Requirements
and
Floor
Cutouts
The
zSeries
800
system
requires
11.1
m
3
/min.
(400
f
3
/min.)
of
chilled
airflow
from
under
the
raised
floor
for
adequate
cooling.
Air
flows
through
the
machine
from
bottom
to
top,
exiting
at
the
top
of
the
rear
cover.
Heated
exhaust
air
should
exit
the
computer
room
above
the
computing
equipment.
If
your
computer
room
uses
hot
and
cold
aisles,
the
front
of
the
machine
should
face
a
cold
aisle.
If
you
are
planning
an
installation
on
a
non-raised
floor,
refer
to
Appendix
B,
“Environmental
Specifications,”
on
page
B-1
for
the
environmental
conditions
you
must
provide
to
ensure
proper
machine
operation.
After
reviewing
the
environmental
information,
return
to
“Considerations
for
Multiple
System
Installations”
on
page
2-9
read
the
information
about
″
Inter-system
cabling
″
,
and
continue
from
there.
d = 762 mm (30 in) - front
e = 762 mm (30 in) - rear
f = 762 mm (30 in) - each side
g = 2244 mm (88.3 in) - side to side total
h = 2670 mm (105.1 in) - front to rear total
Minimum Service Clearances
Rear
Front
d
e
h
g
f
f
Figure
2-4.
System
Service
Clearance
Level
04a,
June
21,
2004
2-6
zSeries
800:
Installation
Manual
for
Physical
Planning
Содержание 800
Страница 1: ...zSeries 800 Installation Manual for Physical Planning 2066 IMPP 04 Level 04a June 21 2004 ERserver ...
Страница 2: ......
Страница 3: ...zSeries 800 Installation Manual for Physical Planning 2066 IMPP 04 Level 04a June 21 2004 ERserver ...
Страница 8: ...Level 04a June 21 2004 vi zSeries 800 Installation Manual for Physical Planning ...
Страница 10: ...Level 04a June 21 2004 viii zSeries 800 Installation Manual for Physical Planning ...
Страница 12: ...Level 04a June 21 2004 x zSeries 800 Installation Manual for Physical Planning ...
Страница 16: ...Level 04a June 21 2004 xiv zSeries 800 Installation Manual for Physical Planning ...
Страница 22: ...Level 04a June 21 2004 1 4 zSeries 800 Installation Manual for Physical Planning ...
Страница 38: ...Level 04a June 21 2004 3 6 zSeries 800 Installation Manual for Physical Planning ...
Страница 52: ...Level 04a June 21 2004 4 14 zSeries 800 Installation Manual for Physical Planning ...
Страница 82: ...Level 04a June 21 2004 A 2 zSeries 800 Installation Manual for Physical Planning ...
Страница 84: ...Level 04a June 21 2004 B 2 zSeries 800 Installation Manual for Physical Planning ...
Страница 86: ...Level 04a June 21 2004 C 2 zSeries 800 Installation Manual for Physical Planning ...
Страница 90: ...Level 04a June 21 2004 D 4 zSeries 800 Installation Manual for Physical Planning ...
Страница 97: ......
Страница 98: ... Level 04a June 21 2004 Printed in USA 2066 IMPP 04 ...