correctly located, remove the lower plastic isolator bushings.
1
Rack chassis
7
Jam nut
2
Rack-mounting bolt
8
Leveling foot
3
Thin washer
9
Lower plastic isolator bushing (used
only on dc powered systems)
4
Top plastic isolator bushing
ac
Typical leveling foot installation for
an ac-powered rack
5
Thick washer
dc
Typical leveling foot installation for
an dc-powered rack
6
Spacer
6.
Position the two mounting plates in the approximate mounting location under the rack.
7.
Create a rack-mounting bolt assembly by adding the following items, in the order listed, to each
rack-mounting bolt.
a.
Thin washer
b.
Top plastic isolator bushing
c.
Thick flat washer
d.
Spacer
8.
Insert a rack-mounting bolt assembly through each of the leveling feet.
9.
Reposition the rack-mounting plates under the four rack-mounting bolts so that the mounting bolts
are centered directly over the threaded bolt holes.
10.
Turn the rack-mounting bolts four complete turns into the mounting plate's threaded bolt holes.
Figure 5. Installing ac-power mounting plates
6
Power Systems: Racks and rack features
Содержание 7014-T42
Страница 1: ...Power Systems Racks and rack features ...
Страница 2: ......
Страница 3: ...Power Systems Racks and rack features ...
Страница 6: ...iv Power Systems Racks and rack features ...
Страница 72: ...60 Power Systems Racks and rack features ...
Страница 73: ......
Страница 74: ... Printed in USA ...