3
Latch-lever
6.
Place
the
front
end
of
the
left
rail
in
the
rack
cabinet.
Align
the
top
of
the
front
bracket
1
with
the
required
EIA
marking
that
is
on
the
rack.
1
Front
bracket
2
Rack-mounting
flange
3
Locating
pins
7.
Align
the
locating
pins
3
with
the
holes
that
are
in
the
rack-mounting
flange.
8.
Push
the
latch
lock
2
away
from
the
rail
to
release
the
carrier.
The
latch-lock
carrier
slides
toward
the
front
of
the
rack
and
the
locating
pins
project
through
the
holes
that
are
in
the
front
flange
and
in
the
front
rail
bracket.
Important:
Ensure
that
the
locating
pins
are
fully
extended
through
the
front
rail
bracket.
1
2
3
Figure
46.
Installing
the
front
end
of
the
rail
68
IBM
System
Storage
SAN
Volume
Controller:
Installation
Guide
Содержание 2145-4F2
Страница 1: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Страница 2: ......
Страница 3: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Страница 8: ...vi IBM System Storage SAN Volume Controller Installation Guide...
Страница 74: ...44 IBM System Storage SAN Volume Controller Installation Guide...
Страница 78: ...48 IBM System Storage SAN Volume Controller Installation Guide...
Страница 120: ...90 IBM System Storage SAN Volume Controller Installation Guide...
Страница 122: ...92 IBM System Storage SAN Volume Controller Installation Guide...
Страница 128: ...98 IBM System Storage SAN Volume Controller Installation Guide...
Страница 134: ...104 IBM System Storage SAN Volume Controller Installation Guide...
Страница 138: ...108 IBM System Storage SAN Volume Controller Installation Guide...
Страница 141: ......
Страница 142: ...Part Number 31P0797 Printed in USA GC26 7900 00 1P P N 31P0797...
Страница 143: ...Spine information IBM System Storage SAN Volume Controller Installation Guide Version 4 1 0...