background image

Chapter

 

5.

 

Using

 

the

 

front

 

panel

 

of

 

the

 

SAN

 

Volume

 

Controller

 

The

 

front

 

panel

 

of

 

the

 

SAN

 

Volume

 

Controller

 

displays

 

indicators

 

and

 

switches

 

that

 

are

 

useful

 

when

 

servicing

 

your

 

SAN

 

Volume

 

Controller.

 

See

 

the

 

related

 

topics

 

for

 

the

 

SAN

 

Volume

 

Controller

 

indicators

 

and

 

switches.

 

   

Related

 

concepts

 

   

“Cluster

 

options”

 

on

 

page

 

83

The

 

main

 

cluster

 

option

 

from

 

the

 

menu

 

can

 

display

 

the

 

cluster

 

name,

 

IP

 

address,

 

or

 

can

 

be

 

blank.

 

   

“Node

 

options”

 

on

 

page

 

84

The

 

node

 

option

 

displays

 

the

 

identification

 

number

 

or

 

name

 

of

 

the

 

SAN

 

Volume

 

Controller.

   

Related

 

reference

 

   

“Ethernet

 

option”

 

on

 

page

 

88

The

 

Ethernet

 

option

 

displays

 

the

 

operational

 

states

 

of

 

the

 

Ethernet

 

port

 

and

 

its

 

media

 

access

 

control

 

(MAC)

 

address.

 

   

“Fibre

 

channel

 

port-1

 

through

 

4

 

option”

 

on

 

page

 

88

The

 

fibre

 

channel

 

port-1

 

through

 

4

 

options

 

display

 

the

 

operational

 

status

 

of

 

the

 

fibre-channel

 

ports.

 

   

“Select

 

language?

 

option”

 

on

 

page

 

88

The

 

language

 

displayed

 

can

 

be

 

changed

 

from

 

the

 

menu.

Boot

 

progress

 

indicator

 

Boot

 

progress

 

is

 

displayed

 

on

 

the

 

front

 

panel

 

of

 

the

 

SAN

 

Volume

 

Controller.

 

Figure

 

56

 

shows

 

that

 

the

 

node

 

is

 

starting.

 

 

During

 

the

 

boot

 

operation,

 

boot

 

progress

 

codes

 

are

 

displayed

 

and

 

the

 

progress

 

bar

 

moves

 

to

 

the

 

right

 

while

 

the

 

boot

 

operation

 

proceeds.

 

Boot

 

failed

 

If

 

the

 

boot

 

operation

 

fails,

 

a

 

boot

 

code

 

is

 

displayed.

 

 

B o o t i n g

1 3 0

  

Figure

 

56.

 

Boot

 

progress

 

display

F a i l e d

1 8 0

  

 

©

 

Copyright

 

IBM

 

Corp.

 

2003,

 

2006

 

79

Содержание 2145-4F2

Страница 1: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...

Страница 2: ......

Страница 3: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...

Страница 4: ...rts read the information in Notices and Safety and Environmental Notices Copyright International Business Machines Corporation 2003 2006 All rights reserved US Government Users Restricted Rights Use d...

Страница 5: ...indicators 11 Fibre channel LEDs 12 Ethernet connection LED 13 Power location and system error LEDs 13 AC and DC LEDs 13 System board power LED 14 System board fault LED 14 Monitor LED 14 Lower Ethern...

Страница 6: ...utting down 81 Error codes 82 SAN Volume Controller menu options 82 Cluster options 83 Node options 84 Ethernet option 88 Fibre channel port 1 through 4 option 88 Select language option 88 Accessibili...

Страница 7: ...g the mounting bracket to the 2145 UPS 1U 53 30 Installing the mounting screws for the 2145 UPS 1U 54 31 Removing the 2145 UPS 1U front panel 54 32 Internal battery connector with protective label 55...

Страница 8: ...vi IBM System Storage SAN Volume Controller Installation Guide...

Страница 9: ...rovides a list of new modified and changed information since the last version of the guide New information This topic describes the changes to this guide since the previous edition SC26 7541 05 The fo...

Страница 10: ...a word In command syntax it is used for variables for which you supply actual values such as a default directory or the name of a cluster Monospace Text in monospace identifies the data or commands th...

Страница 11: ...o install the SAN Volume Controller GC26 7900 IBM System Storage SAN Volume Controller Planning Guide This guide introduces the SAN Volume Controller and lists the features you can order It also provi...

Страница 12: ...The IBM publications center The IBM publications center offers customized search functions to help you find the publications that you need Some publications are available for you to view or download...

Страница 13: ...lume Controller or an uninterruptible power supply UPS The Danger and Caution notices for the SAN Volume Controller and any related UPSs can be found in the IBM System Safety Notices Please review the...

Страница 14: ...resent you must determine how serious the apparent hazard could be and whether you can continue without first correcting the problem For example consider the following conditions and their potential s...

Страница 15: ...ge 5 Check the external signal cable for damage 6 Check the cover for sharp edges damage or alterations that expose the internal parts of the device 7 Correct any problems that you find Internal machi...

Страница 16: ...ctor 4 5 Follow your local procedures and check the grounding of the SAN Volume Controller 2145 8F4 Any test equipment must be connected to the frame of the SAN Volume Controller 2145 8F4 If the groun...

Страница 17: ...ceptacle of the 2145 UPS 1U Also ensure that the other end of the 2145 UPS 1U s power cable is connected from the 2145 UPS 1U to the distribution point in the rack Figure 3 shows the connectors for th...

Страница 18: ...page xv through step 5 on page xv again Checking the grounding of the SAN Volume Controller 2145 4F2 and the 2145 UPS Ensure that you understand how to check the grounding for the SAN Volume Controlle...

Страница 19: ...go no further with these instructions If the grounding is not correct unplug the power cable 1 from the 2145 UPS 6 Check for continuity between the frame of the SAN Volume Controller 2145 4F2 and the...

Страница 20: ...llowing steps to file a claim for the shipping damage a File with the carrier within fifteen days of receipt of the equipment b Send a copy of the damage claim within fifteen days to your service supp...

Страница 21: ...yright IBM Corp 1981 2002 All rights reserved US Government Users Restricted Rights Use duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp svc00207 VCCI A A R33026 CANADA...

Страница 22: ...e label v Do not discard the UPS or the UPS batteries in the trash label Note The UPS can contain sealed lead acid batteries which must be recycled Checking the 2145 UPS labels Ensure that you locate...

Страница 23: ...o changing labeling requirements svc00149 2 1 3 2 1 3 COM SURGE SUPPRESSOR GROUND SCREW Remove to comply with national deviations UK DE SE INPUT INLET LOAD GROUP 1 16A MAX REPO CONNECTOR A Use Class 2...

Страница 24: ...v Three man lift label v Weight label v IT compatible label v Power ratings and no user access label f2c00425 IT COMPATIBLE xxii IBM System Storage SAN Volume Controller Installation Guide...

Страница 25: ...r the battery of the 2145 uninterruptible power supply 1U 2145 UPS 1U v Do not discard the UPS or the UPS batteries in the trash label Note The UPS can contain sealed lead acid batteries which must be...

Страница 26: ...the UPS batteries in the trash label Note The UPS can contain sealed lead acid batteries which must be recycled v Recycling label v Weight label f2c00425 svc00148 xxiv IBM System Storage SAN Volume Co...

Страница 27: ...IQUEMENT OPREZ Za upotrebu u kontroliranom okru enju Vi e od jednog ivog strujnog kruga SAMO kvalificirano servisno osoblje Pas p Til brug i et kontrolleret milj Mere end t str mf rende kredsl b KUN u...

Страница 28: ...E is to be collected separately and to be reused recycled or recovered at end of life Users of EEE with the WEEE marking per Annex IV of the WEEE Directive as shown previously must not dispose of end...

Страница 29: ...00 426 4333 Please have the IBM part number listed on the battery available prior to your call CAUTION A lithium battery can cause fire explosion or a severe burn Do not recharge disassemble heat abov...

Страница 30: ...age and install it directly into your SAN Volume Controller without putting it down If it is necessary to put the device down place it onto its static protective bag If your device is an adapter place...

Страница 31: ...f the network that contains these units is known as the fabric of the network The SAN Volume Controller is analogous to a logical volume manager LVM on a SAN The SAN Volume Controller performs the fol...

Страница 32: ...or 2145 uninterruptible power supply 2145 UPS units A SAN Volume Controller I O group takes the storage that is presented to the SAN by the storage subsystems as MDisks and translates that storage in...

Страница 33: ...gateways hubs and switches A single cluster SAN contains two distinct types of zones a host zone and a disk zone In the host zone the host systems can identify and address the SAN Volume Controller no...

Страница 34: ...is common to all the SAN Volume Controller nodes in the cluster and any system that is connected to the Ethernet network can access this VPD Cluster configuration information is stored on every SAN V...

Страница 35: ...ng Web site for the latest support and coexistence information http www ibm com servers storage software virtualization svc User interfaces The SAN Volume Controller provides the following user interf...

Страница 36: ...nd indicators 1 Power button 2 Power LED 3 Check LED 4 Navigation buttons 5 Select button 6 Front panel display 7 Node identification label Related reference Operator information panel on page 9 The o...

Страница 37: ...ot progress v Boot failed v Powering off v Restarting v Shutting down v Power failure v Error codes Navigation buttons You can use the navigation buttons to move through menus There are four navigatio...

Страница 38: ...oduct If the system board is replaced you must follow the system board replacement instructions carefully and rewrite the serial number on the system board Cache LED System activity is indicated throu...

Страница 39: ...d buttons for the SAN Volume Controller 2145 8F2 or SAN Volume Controller 2145 8F4 1 Release latch for light path diagram 2 System error LED amber 3 Information LED amber 4 Location LED blue 5 Hard di...

Страница 40: ...ity is shown on the hard disk drive itself and also on the hard disk drive activity LED Power control button The power control button switches on or switches off the main power to the SAN Volume Contr...

Страница 41: ...45 8F4 rear panel indicators 1 Ethernet connection LED 2 Power location and system error LEDs 3 Ac and dc LEDs 4 Fibre channel LEDs SAN Volume Controller 2145 8F2 rear panel indicators 1 Fibre channel...

Страница 42: ...d one above the other The LEDs are arranged in the same order as the ports and are displayed in Figure 11 Table 2 describes the status of the link LEDs Table 2 Settings for the SAN Volume Controller 2...

Страница 43: ...elow are the descriptions of the power location and system error LEDs Power LED This is the top of the three LEDs and indicates that ac power is present on the SAN Volume Controller 2145 8F2 or SAN Vo...

Страница 44: ...board fault LED in the documentation on the rear panel indicators Monitor LED The green monitor LED is not used on the SAN Volume Controller You can view the monitor LED in the documentation concerni...

Страница 45: ...concerning the rear panel indicators SAN Volume Controller hardware It is important that you familiarize yourself with the SAN Volume Controller hardware SAN Volume Controller 2145 8F4 hardware It is...

Страница 46: ...me unplugged from the uninterruptible power supply UPS The bracket must be installed after you install the SAN Volume Controller in the rack You can attach the bracket to the support rail by performin...

Страница 47: ...e the related documentation on the 2145 UPS 1U hardware for more information SAN Volume Controller 2145 8F4 connectors The external connectors for the SAN Volume Controller 2145 8F4 can be easily loca...

Страница 48: ...4 or any other application that might be run on this hardware is not supported See Figure 15 for those ports that are not used svc00208 1 2 3 4 5 6 1 System management port 2 Ethernet port 2 3 Mouse p...

Страница 49: ...us adapter full height 10 Full height riser card 11 Low profile riser card 12 Dual port fibre channel host bus adapter low profile 13 Microprocessor heat sink 14 Microprocessor 15 Heat sink retainer 5...

Страница 50: ...ibre channel port 3 8 Serial connection 9 Fibre channel port 4 The following figure shows the type of connector located on the power supply assembly The connector enables you to connect the SAN Volume...

Страница 51: ...nce keys below the figure to match the reference keys in the example 1 Top cover 2 Power supply connector 3 Fan with baffle 15 14 1 6 2 7 3 8 4 9 x4 11 12 13 10 x4 5 16 Figure 16 Exploded view of the...

Страница 52: ...ller 2145 4F2 connectors The external connectors for the SAN Volume Controller can be located easily Context Use the reference keys below the figure to match the reference keys in Figure 17 1 Power co...

Страница 53: ...he following four tables list the physical dimensions and weight of the node as well as other environmental requirements that you must consider before you install your SAN Volume Controller 2145 8F2 o...

Страница 54: ...no precipitation 29 C 84 F Preparing your SAN Volume Controller 2145 4F2 environment The following four tables list the physical dimensions and weight of the SAN Volume Controller 2145 4F2 node as we...

Страница 55: ...at your physical site meets the installation requirements for the uninterruptible power supply UPS Fibre channel port numbers and worldwide port numbers Fibre channel ports are identified by their phy...

Страница 56: ...ller concurrent replacement and to enable some concurrent upgrade operations The WWPNs are in the form 5005076801QXXXXX where XXXXX is as previously stated and Q is related to the port number as follo...

Страница 57: ...roller dynamic random access memory DRAM in the event of an unexpected loss of external power Data is saved to the SAN Volume Controller internal disk The UPS units are required to power the SAN Volum...

Страница 58: ...terruptible power supply UPS Each 2145 UPS can support up to two SAN Volume Controller 2145 4F2 nodes The 2145 UPS 1U can only support one SAN Volume Controller 2145 8F4 node one SAN Volume Controller...

Страница 59: ...the contents of its dynamic random access memory DRAM to the internal disk drive When input power to the UPS is restored the SAN Volume Controller node restarts and restores the original contents of...

Страница 60: ...is configuration ensures that cache and cluster state information is protected in the event of a failure of either the UPS or the mainline power source When SAN Volume Controller nodes are added to th...

Страница 61: ...145 UPS 1U to power off the unit Test and alarm reset button Use the test and alarm reset button to start the self test To start the self test press and hold the test and alarm reset button for three...

Страница 62: ...power is available to this segment See the 2145 UPS 1U hardware documentation for the location of the power outlets for this segment Hardware for the 2145 UPS 1U The 2145 uninterruptible power supply...

Страница 63: ...any other application that may be used with the SAN Volume Controller is not supported See Figure 21 for the 2145 UPS 1U ports that are not used 1 USB interface port 2 Network ports 3 Load segment rec...

Страница 64: ...performing the following steps 1 Install the power cable into the far right power supply on the rear of the 2145 UPS 1U 2 Remove the bracket and the two screws from the packaging See Figure 22 3 Plac...

Страница 65: ...t Part United States of America Chicago Canada Mexico 1 8 m 6 ft NEMA L6 15P 7842122 Bahamas Barbados Bermuda Bolivia Brazil Canada Cayman Islands Colombia Costa Rica Dominican Republic Ecuador El Sal...

Страница 66: ...e French Guiana Germany Greece Guinea Hungary Iceland Indonesia Iran Ivory Coast Jordan Lebanon Luxembourg Malagasy Mali Martinique Mauritania Mauritius Monaco Morocco Mozambique Netherlands New Caled...

Страница 67: ...tandby mode means that the 2145 UPS is turned off but is still connected to the main power source No power is available from the 2145 UPS output sockets but the 2145 UPS monitors and charges its batte...

Страница 68: ...ors The load level indicators show the percentage of the 2145 uninterruptible power supply 2145 UPS capacity that the SAN Volume Controller 2145 4F2 is using When all the indicators are lit the power...

Страница 69: ...temperature problem occurs When the general alarm indicator is accompanied by the audio alarm beeping every five seconds the battery is low If the audio alarm is continuous the internal temperature o...

Страница 70: ...rements to choose the appropriate power cable for the 2145 uninterruptible power supply 2145 UPS The following table lists the power cable requirements for your country or region Country or region Len...

Страница 71: ...ralia China PRC New Zealand Papua New Guinea Paraguay Uruguay Western Samoa 2 5 m 8 ft L6 20P 12J5118 Afghanistan Albania Algeria Andorra Angola Austria Belgium Benin Bulgaria Burkina Faso Burundi Cam...

Страница 72: ...voltage that is supplied to the 2145 UPS must be 200 240 V single phase v The frequency supplied to the 2145 UPS must be 50 or 60 Hz Attention Ensure that you comply with the following requirements fo...

Страница 73: ...environment Shipping environment Altitude from sea level 0 2000 m 0 6560 ft 0 2000 m 0 6560 ft 0 2000 m 0 6560 ft 0 15 000 m 0 49212 ft Heat output maximum The heat output parameters are the following...

Страница 74: ...44 IBM System Storage SAN Volume Controller Installation Guide...

Страница 75: ...e Shell SSH v SAN topology rendering v Remote service capability through VPN v IBM Director SNMP trap management Call home service alert capability E mail notification to the system administrator Rela...

Страница 76: ...on the master console to meet your requirements Preparing your master console environment Ensure that your physical site meets the installation requirements for the master console server and console...

Страница 77: ...140 F Maximum 2133 m 6998 0 ft 8 to 80 Server heat output Approximate heat output in British thermal units BTU per hour v Minimum configuration 87 watts 297 BTU v Maximum configuration 150 watts 512 B...

Страница 78: ...48 IBM System Storage SAN Volume Controller Installation Guide...

Страница 79: ...ed to complete the installation procedures If you are connecting cables to switches that are currently in use confirm with the customer that it is safe for you to proceed Go no further with these inst...

Страница 80: ...port rails in the rack before installing the 2145 uninterruptible power supply 1U 2145 UPS 1U Complete the following prerequisites before installing the support rails 1 Refer to the user s hardware lo...

Страница 81: ...lign with the EIA mark on the rack 6 Using two M6 10 screws 1 in Figure 27 and two clip nuts 2 attach the rail to the rear of the rack 7 Attach only the bottom hole of the rail to the front of the rac...

Страница 82: ...onmental notices before starting the installation process Use the reference numbers in parentheses at the end of each notice to find the matching translated notice For the translation of the danger ca...

Страница 83: ...2145 UPS 1U in the rack 1 Open the top of the 2145 UPS 1U shipping carton Grip the flaps on either side of the 2145 UPS 1U 2 Lift the 2145 UPS 1U clear of the shipping carton and place it on a flat s...

Страница 84: ...1U must be 200 240 V single phase v The frequency supplied must be 50 or 60 Hz Note The 2145 UPS 1U has an integrated circuit breaker and does not require external protection 6 Remove the 2145 UPS 1U...

Страница 85: ...in power connector into the power socket 1 in Figure 33 on page 56 The 2145 UPS 1U is in standby mode so all indicators are off Note The 2145 UPS 1U is intended to maintain power on SAN Volume Control...

Страница 86: ...the 2145 UPS 1U the SAN Volume Controller automatically adjusts the voltage range setting Take no action for this alarm condition unless it persists for more than five minutes after a SAN Volume Contr...

Страница 87: ...n in the rack The only device that can be beneath a 2145 UPS is another UPS The bottom of the flange of the support rail must align with the EIA mark on the rack Note The user can already have install...

Страница 88: ...you have completed step 8 7 Ensure that the support rail is horizontal a level might be useful here 8 Install the two mounting screws 1 into the third and fourth holes of the support rail flange Fully...

Страница 89: ...not remove or unplug the input cord when the 2145 UPS is turned on This removes the safety ground from the 2145 UPS and the equipment connected to the 2145 UPS 12 CAUTION To reduce the risk of fire or...

Страница 90: ...hipping carton With the assistance of another service representative grip the flaps on either side of the 2145 UPS see Figure 36 b Slide the 2145 UPS to the end of the carton and rest its front edge o...

Страница 91: ...he 2145 UPS and place to one side Note The front cover for the 2145 UPS is not installed however it is included inside of the shipping carton The front cover is installed later in the installation pro...

Страница 92: ...ice representative place the back of the 2145 UPS onto the support rails and then slide it into the rack 6 Install the front flathead screws 1 as seen in Figure 40 on page 63 1 2 Figure 39 Removing th...

Страница 93: ...ord you are usually not required to use this additional grounding screw feature 8 Install the front panel 9 At the back of the 2145 UPS plug the 2145 UPS main power cable 1 in Figure 41 on page 64 int...

Страница 94: ...second and 1 msec glitch rejection 10 All front panel indicators of the 2145 UPS flash for a short time while the 2145 UPS runs a self test When the test is complete the mode indicator 1 flashes to sh...

Страница 95: ...rdware location chart the cable connection table and the configuration data table for the customer to complete prior to installation To install the master console in the rack follow the instructions p...

Страница 96: ...ume Controller You must install the support rails that hold the SAN Volume Controller Before you install the support rails perform the following tasks v Determine where the SAN Volume Controller is to...

Страница 97: ...e latch lever engages a hole in the back bracket assembly and holds the latch lock carrier in the retracted position 5 Push the back rail bracket 1 Figure 45 toward the front of the rail until it stop...

Страница 98: ...e rack mounting flange 8 Push the latch lock 2 Figure 47 on page 69 away from the rail to release the carrier The latch lock carrier slides toward the front of the rack and the locating pins project t...

Страница 99: ...slide rail Store the shipping bracket for further use You must perform this procedure for both rails Installing the SAN Volume Controller in the rack After installing the support rails you may instal...

Страница 100: ...ler 2145 8F4 to the 2145 UPS 1U Before you connect the SAN Volume Controller 2145 8F2 or SAN Volume Controller 2145 8F4 node to the 2145 uninterruptible power supply 1U 2145 UPS 1U review the restrict...

Страница 101: ...port 7 Load segment 2 receptacle 2 Place the other end of the power cable into the rightmost load segment 2 receptacle 7 on the 2145 UPS 1U 3 Plug the signal cable into the serial connector 3 located...

Страница 102: ...e located on the front panel assembly Connecting the SAN Volume Controller 2145 4F2 to the 2145 UPS Connecting the SAN Volume Controller 2145 4F2 node to the 2145 uninterruptible power supply 2145 UPS...

Страница 103: ...ume Controller 2145 4F2 power is now connected to the 2145 UPS Related tasks Inspecting the SAN Volume Controller for unsafe conditions on page xii Use caution when working in any potential safety haz...

Страница 104: ...SAN and to the Ethernet network Before you connect the SAN Volume Controller to the SAN you must connect the Ethernet and fibre channel cables Before you begin this task refer to the user s cable conn...

Страница 105: ...Volume Controller Related reference SAN Volume Controller controls and indicators on page 5 All controls and indicators are located on the front panel of the SAN Volume Controller Ethernet option on...

Страница 106: ...display test is performed When the display test is complete the check light goes off and a button test is started 3 Press the up down left and right buttons to verify that they are working Figure 53...

Страница 107: ...ibre channel MAP to repair the fault 14 Press the select button to return to the fibre channel status display 15 Press the right button to display each port in turn and repeat the above speed check Go...

Страница 108: ...N Volume Controller When the battery is fully charged the charge progress bar is replaced by the Cluster option on the front panel display of the SAN Volume Controller The installation is now complete...

Страница 109: ...Ethernet option displays the operational states of the Ethernet port and its media access control MAC address Fibre channel port 1 through 4 option on page 88 The fibre channel port 1 through 4 option...

Страница 110: ...software includes the operating system the application software and the SAN Volume Controller publications It is normally not necessary to replace the software on a node but if the software is lost f...

Страница 111: ...eft until the node finishes saving its data After the data is saved the progress bar moves to the right during the restart operation Shutting down The front panel indicator tracks shutdown operations...

Страница 112: ...on line 2 The first option displayed is the cluster option Use the Left and Right buttons to navigate through the secondary fields that are associated with some of the main fields Note Messages might...

Страница 113: ...SAN Volume Controller node is a member of a cluster but is not now operational It is not operational because the other SAN Volume Controller nodes that are in the cluster cannot be accessed or becaus...

Страница 114: ...in node option displays the identification number of the SAN Volume Controller or the name of the SAN Volume Controller if the user has assigned a name Status Use the status to diagnose cluster failur...

Страница 115: ...luster that you are going to create Be sure to verify the correct IP address with the customer before you create a cluster Attention If you change the IP address ensure that you type the correct addre...

Страница 116: ...he first subnet mask number is displayed 2 Press the up button if you want to increase the value that is displayed press the down button if you want to decrease that value If you want to quickly incre...

Страница 117: ...is displayed on line 2 Be sure to immediately record the password it is required on the first attempt to access the cluster Attention The password displays for only 60 seconds or until a front panel b...

Страница 118: ...perational but cannot access the fibre channel fabric One of the following conditions caused this result v The fibre channel cable has failed v The fibre channel cable is not installed v The device th...

Страница 119: ...erman v Italian v Japanese v Korean v Portuguese v Spanish v Chinese simplified v Chinese traditional If you do not understand the language that is displayed wait for at least 60 seconds for the menu...

Страница 120: ...90 IBM System Storage SAN Volume Controller Installation Guide...

Страница 121: ...inations v To traverse to the next link button or topic press Tab inside a frame page v To expand or collapse a tree node press or respectively v To move to the next topic node press V or Tab v To mov...

Страница 122: ...92 IBM System Storage SAN Volume Controller Installation Guide...

Страница 123: ...HER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF NON INFRINGEMENT MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Some states do not allow disclaimer of express or imp...

Страница 124: ...of data and reports used in daily business operations To illustrate them as completely as possible the examples include the names of individuals companies brands and products All of these names are f...

Страница 125: ...ial area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense Properly shielded and grounded cables and connectors must be use...

Страница 126: ...norme NMB 003 du Canada New Zealand compliance statement Ensure that you are familiar with the New Zealand compliance statement This is a Class A product In a domestic environment this product might c...

Страница 127: ...e A Ger te bed rfen folgender Hinweise Nach dem EMVG Ger te d rfen an Orten f r die sie nicht ausreichend entst rt sind nur mit besonderer Genehmigung des Bundesministeriums f r Post und Telekommunika...

Страница 128: ...98 IBM System Storage SAN Volume Controller Installation Guide...

Страница 129: ...formation Model CIM A set of standards developed by the Distributed Management Task Force DMTF CIM provides a conceptual framework for storage management and an open approach to the design and impleme...

Страница 130: ...ter HBA In SAN Volume Controller an interface card that connects a host bus such as a peripheral component interconnect PCI bus to the storage area network host ID In SAN Volume Controller a numeric i...

Страница 131: ...d disk MDisk A Small Computer System Interface SCSI logical unit that a redundant array of independent disks RAID controller provides and a cluster manages The MDisk is not visible to host systems on...

Страница 132: ...ware interface that enables a variety of peripheral devices to communicate with one another SNMP See Simple Network Management Protocol storage area network SAN A network whose primary purpose is the...

Страница 133: ...a concept in which a pool of storage is created that contains several disk subsystems The subsystems can be from various vendors The pool can be split into virtual disks that are visible to the host...

Страница 134: ...104 IBM System Storage SAN Volume Controller Installation Guide...

Страница 135: ...er LED 10 select button 7 SAN Volume Controller 2145 4F2 power button 8 SAN Volume Controller 2145 8F2 cache LED 8 error LED 7 operator information panel 9 power control button 10 release latch 9 SAN...

Страница 136: ...Controller 2145 4F2 lower Ethernet connection LED 14 monitor LED 14 system board fault LED 14 system board power LED 14 upper Ethernet connection LED 15 SAN Volume Controller 2145 8F2 AC and DC LEDs...

Страница 137: ...rt rails installing 66 using the front panel 79 weight and dimensions 23 SAN Volume Controller 2145 4F2 checking grounding xvi connectors 22 hardware 21 SAN Volume Controller 2145 8F2 checking groundi...

Страница 138: ...108 IBM System Storage SAN Volume Controller Installation Guide...

Страница 139: ...ied Accurate h h h h h Complete h h h h h Easy to find h h h h h Easy to understand h h h h h Well organized h h h h h Applicable to your tasks h h h h h Please tell us how we can improve this book Th...

Страница 140: ...elopment Department 61C 9032 South Rita Road Tucson Arizona 85775 4401 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Страница 141: ......

Страница 142: ...Part Number 31P0797 Printed in USA GC26 7900 00 1P P N 31P0797...

Страница 143: ...Spine information IBM System Storage SAN Volume Controller Installation Guide Version 4 1 0...

Отзывы: