background image

USER’S INFORMATION MANUAL

10

SL SERIES BOILERS

Relief Valve - Maintenance and Testing

The relief valve manufacturer requires that under normal operating conditions 

a “try lever test” must be performed every two months. Under severe service 

conditions, or if corrosion and/or deposits are noticed within the valve body, 

testing must be performed more often. A “try lever test” must also be performed 

at the end of any non-service period.
Test at or near maximum operating pressure by holding the test lever fully open 

for at least 5 seconds to flush the valve seat free of sediment and debris. Then 

release the lever and permit the valve to snap shut.
If the lever does not activate, or there is not evidence of discharge, discontinue 

use of equipment immediately and contact a licensed contractor or qualified 

service personnel.
If the relief valve does not completely seal, and fluid continues to leak from the 

discharge pipe - perform the test again to try and flush any debris that may be 

lodged in the valve. If repeated tries fail to stop the leakage, contact a licensed 

contractor or qualified service personnel to replace the valve.
While performing a “try lever test”, a quantity of heat transfer fluid will be 

discharged from the piping system and the system pressure will drop. This fluid 

must be replaced. It is highly recommended that a system pressurization unit, 

such as an 

Axiom Industries model MF200

 be employed to refill and pressurize 

your system. Capture the discharged fluid in a container and recycle it by 

returning it to the system feeder unit. This is particularly important when your 

system contains treatment chemicals or glycol solutions. If the system employs 

plain water, the boiler auto fill valve must be turned on in order to recharge the 

lost fluid.

Blocked Vent Safety System

The boiler is equipped with a blocked vent safety system to prevent the boiler 

from operating in the event the boilers exhaust piping is blocked.  The boiler will 

automatically stop operating when the restriction in the venting system becomes 

too restrictive.  If the boiler shuts down due to a blocked vent, a qualified service 

technician must be called to inspect the boiler and venting system and correct 

the problem.

CAUTION

Before testing the relief valve, 

make certain the discharge 

pipe is properly connected to 

the valve outlet and arranged 

to contain and safely dispose 

of equipment discharge.

NOTE

Installers should inquire of 

local water purveyors as to 

the suitability of their supply 

for use in hydronic heating 

systems.
If water quality is questionable, 

a local water treatment expert 

must be consulted for testing, 

assessment and, if required, 

treatment.
Alternatively, water or hydronic 

fluid of known quality can be 

brought to the site.

WARNING

Do not use automotive-type 

ethylene or other types of 

automotive glycol antifreeze, 

or undiluted antifreeze of 

any kind. This may result 

in severe boiler damage. It 

is the responsibility of the 

Installer to ensure that glycol 

solutions are formulated to 

inhibit corrosion in hydronic 

heating systems of mixed 

materials. Improper mixtures 

and chemical additives may 

cause damage to ferrous and 

non-ferrous components as 

well as non-metallic, wetted 

components, normally found 

in hydronic systems. Ethylene 

glycol is toxic, and may be 

prohibited for use by codes 

applicable to your installation 

location. For environmental 

and toxicity reasons, IBC 

recommends only using non-

toxic propylene glycol.

Содержание SL SERIES

Страница 1: ...pliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a nearby phone Fo...

Страница 2: ...information in this manual is not followed exactly a fire or explosion may result causing property damage personal injury or loss of life WARNING Points out a potentially hazardous situation which mu...

Страница 3: ...3 USER S INFORMATION MANUAL SL SERIES BOILERS WARNINGS 3 IBC BOILER CONTROLLER 6 LIGHTING AND SHUTTING DOWN THE BOILER 8 MAINTENANCE 9 SERVICE RECORD 11 CONTENTS...

Страница 4: ...llows Acidity pH is to be between 6 5 and 8 5 Chloride is to be less than 125 mg l Iron is to be less than 0 3 mg l Cu less than 0 1 mg l Conductivity is to be less than 400 S cm at 25 C Hardness is t...

Страница 5: ...tible materials gasoline and other flammable vapours and liquids WARNING Combustion air must not be drawn from areas containing corrosive air from swimming pools or spas including air directly next to...

Страница 6: ...e Home Screen Internet LAN connectivity BACnet with activation Control When the boiler is first energized the controller will go through a power up sequence that will take approximately 90 seconds Dur...

Страница 7: ...play will be showing the Home screen that includes details of the current boiler status If the controller has been left on the Home screen long enough user adjustable 10 minutes by default the display...

Страница 8: ...USER S INFORMATION MANUAL 8 SL SERIES BOILERS LIGHTING AND SHUTTING DOWN THE BOILER clockwise open close...

Страница 9: ...r and vacuum if required Check for water gas and condensate leaks in the boiler and around the boiler Check the condensate trap and clean if required Re fill the trap and re install the trap hook Chec...

Страница 10: ...chemicals or glycol solutions If the system employs plain water the boiler auto fill valve must be turned on in order to recharge the lost fluid Blocked Vent Safety System The boiler is equipped with...

Страница 11: ...11 USER S INFORMATION MANUAL SL SERIES BOILERS SERVICE RECORD DATE LICENSED CONTRACTOR DESCRIPTION OF WORK DONE...

Страница 12: ...USER S INFORMATION MANUAL 12 SL SERIES BOILERS NOTES...

Страница 13: ...13 USER S INFORMATION MANUAL SL SERIES BOILERS NOTES...

Страница 14: ...E MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE An external energy management system is installed that reduces the boiler water temperature as the heating load decreases Thi...

Страница 15: ...REVISION HISTORY R1 JULY 2014 Initial release R2 MAY 2015 Address update...

Страница 16: ...IBC Technologies Inc 8015 North Fraser Way Burnaby BC Canada V5J 5M8 Tel 604 877 0277 Fax 604 877 0295 www ibcboiler com 120 203 A R2 May 2015 IBC Technologies Inc 2015...

Отзывы: