background image

USER’S INFORMATION MANUAL

6

SL SERIES BOILERS

IBC BOILER CONTROLLER

General

This boiler is equipped with the V-10 Touch Screen controller. The controller 

simplifies the programing of the boiler while providing greater flexibility. For more 

detailed instructions, reference the 

Touch Screen Boiler Controller Manual.

The controller is equipped to provide:

  Control of up to 5 pumps – 1 boiler pump + 4 separate load pumps

  Outdoor Reset control

  Set Point temperature regulation

  Domestic Hot Water (DHW)

  External control via 0-10VDC or 4-20mA signaling

  Alarm dry contacts

  Load Combining – simultaneous operation of 2 similar water temperature 

loads

  The control can manage and/or operate in a network of up to 24 IBC VFC or 

SL boilers

Some of the new features available in the touch screen control include:

  Express Setup Menu for simple, quick programing

  Software updatable in the field with a SD card or a USB stick

  Setup configuration back-up and cloning using SD card or USB stick

  Superior warning messages while setting up the control

  Advanced Error messages with visual display on the Home Screen

  Internet/LAN connectivity

  BACnet (with activation)

Control

When the boiler is first energized, the controller will go through a power up 

sequence that will take approximately 90 seconds. During this time the controller 

is completing a self-diagnostic and loading all previous settings. In the event of 

a power interruption the boiler will automatically resume operation when power 

is restored with all the previously stored values. The controller provides overall 

management of the boiler operations including;

  Power-up, Self-diagnostics, easy Load parameter adjustments

  Burner operation, safety management systems, Call for Heat management 

and Load Priority

  Real time boiler data

  Temperature and throttle operation

  Maintenance of operational and error service logs

  2-way communication between other IBC boilers and controls

Operational and historical data may be accessed at any time using the System 

Status and Load Profiles sections of the control. Error logs are available in the 

Diagnostics section and the controller is capable of recording any or all errors 

since original power-up complete with the date and time of the error.

WARNING

No sharp or metallic object 

should be used on the touch 

screen as this will cause 

damage.  Use only a Stylus or a 

clean finger.

Содержание SL SERIES

Страница 1: ...pliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a nearby phone Fo...

Страница 2: ...information in this manual is not followed exactly a fire or explosion may result causing property damage personal injury or loss of life WARNING Points out a potentially hazardous situation which mu...

Страница 3: ...3 USER S INFORMATION MANUAL SL SERIES BOILERS WARNINGS 3 IBC BOILER CONTROLLER 6 LIGHTING AND SHUTTING DOWN THE BOILER 8 MAINTENANCE 9 SERVICE RECORD 11 CONTENTS...

Страница 4: ...llows Acidity pH is to be between 6 5 and 8 5 Chloride is to be less than 125 mg l Iron is to be less than 0 3 mg l Cu less than 0 1 mg l Conductivity is to be less than 400 S cm at 25 C Hardness is t...

Страница 5: ...tible materials gasoline and other flammable vapours and liquids WARNING Combustion air must not be drawn from areas containing corrosive air from swimming pools or spas including air directly next to...

Страница 6: ...e Home Screen Internet LAN connectivity BACnet with activation Control When the boiler is first energized the controller will go through a power up sequence that will take approximately 90 seconds Dur...

Страница 7: ...play will be showing the Home screen that includes details of the current boiler status If the controller has been left on the Home screen long enough user adjustable 10 minutes by default the display...

Страница 8: ...USER S INFORMATION MANUAL 8 SL SERIES BOILERS LIGHTING AND SHUTTING DOWN THE BOILER clockwise open close...

Страница 9: ...r and vacuum if required Check for water gas and condensate leaks in the boiler and around the boiler Check the condensate trap and clean if required Re fill the trap and re install the trap hook Chec...

Страница 10: ...chemicals or glycol solutions If the system employs plain water the boiler auto fill valve must be turned on in order to recharge the lost fluid Blocked Vent Safety System The boiler is equipped with...

Страница 11: ...11 USER S INFORMATION MANUAL SL SERIES BOILERS SERVICE RECORD DATE LICENSED CONTRACTOR DESCRIPTION OF WORK DONE...

Страница 12: ...USER S INFORMATION MANUAL 12 SL SERIES BOILERS NOTES...

Страница 13: ...13 USER S INFORMATION MANUAL SL SERIES BOILERS NOTES...

Страница 14: ...E MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE An external energy management system is installed that reduces the boiler water temperature as the heating load decreases Thi...

Страница 15: ...REVISION HISTORY R1 JULY 2014 Initial release R2 MAY 2015 Address update...

Страница 16: ...IBC Technologies Inc 8015 North Fraser Way Burnaby BC Canada V5J 5M8 Tel 604 877 0277 Fax 604 877 0295 www ibcboiler com 120 203 A R2 May 2015 IBC Technologies Inc 2015...

Отзывы: