![IBC SL 10-85 G3 Скачать руководство пользователя страница 91](http://html1.mh-extra.com/html/ibc/sl-10-85-g3/sl-10-85-g3_installation-and-operating-manual_605137091.webp)
5.
Fill the condensate trap to the top with
water and replace the union cap and
gasket.
6.
Loosen the upper union, and slide
the trap over the boiler drain outlet,
and then tighten the upper union nut.
7.
To reinstall the trap pan, tilt and slide the
two tabs under the chassis of the boiler,
and secure with the two wing nuts.
8.
Ensure that the bottom union
cap is hand-tightened to
prevent leakage. Do not use
tools and over-torque.
87
7.4 Cleaning the condensate trap
Содержание SL 10-85 G3
Страница 8: ...Intentionally left empty ...
Страница 14: ...Intentionally left empty ...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Страница 78: ...Intentionally left empty ...
Страница 92: ...Intentionally left empty ...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram ...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Страница 109: ...105 Exploded views of boiler parts ...
Страница 114: ...110 Section Appendices ...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices ...
Страница 122: ...Intentionally left empty ...