![IBC SL 10-85 G3 Скачать руководство пользователя страница 71](http://html1.mh-extra.com/html/ibc/sl-10-85-g3/sl-10-85-g3_installation-and-operating-manual_605137071.webp)
67
6.0 Boiler operation
Before operating the appliance, there are some important pre-igntion checks that need to be
performed. For more information, see
Before operating the boiler on page 65
. To understand the
boiler start-up process, see
Sequence of Operation on page 103
6.1 Lighting and shutting down the boiler
Start-up Checklist
Check
Followed lighting and shutting down procedure.
□
Tested the ignition safety shutoff function (see
Testing the ignition safety shutoff on page
).
□
Checked the appliance's fuel source, and if necessary,
using
the appropriate P-kit.
□
Performed gas pressure test by
measuring the inlet gas pressure
□
Содержание SL 10-85 G3
Страница 8: ...Intentionally left empty ...
Страница 14: ...Intentionally left empty ...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Страница 78: ...Intentionally left empty ...
Страница 92: ...Intentionally left empty ...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram ...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Страница 109: ...105 Exploded views of boiler parts ...
Страница 114: ...110 Section Appendices ...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices ...
Страница 122: ...Intentionally left empty ...