![IBC SL 10-85 G3 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/ibc/sl-10-85-g3/sl-10-85-g3_installation-and-operating-manual_605137036.webp)
Place the exhaust vent termination, so that it reaches 12" minimum above the down-
turned intake to avoid exhaust re-ingestion.
(Optionally) Raise the elevation of both terminations in “periscope style” after passing
through the wall, then to gain the required clearance configure as shown in
,
, and
.
Use a 45° elbow on the exhaust termination to launch the plume up and off the sidewall
(for protection of wall). A short piece of venting cut at 45° gives a horizontal termination
protected from wind loads (see
,
, and
).
Recommend the use of a bird screen of ¼" stainless steel or plastic mesh (IPEX
System 636 drain grate) to guard against foreign objects.
Caution
Refer to local code requirements or restrictions when installing concentric side wall
termination kits. Ensure that the termination and venting slope back to the
appliance.
Figure 20
Vent termination clearance
Figure 21
Vent termination clearances
32
Section: Installation
Содержание SL 10-85 G3
Страница 8: ...Intentionally left empty ...
Страница 14: ...Intentionally left empty ...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Страница 78: ...Intentionally left empty ...
Страница 92: ...Intentionally left empty ...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram ...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Страница 109: ...105 Exploded views of boiler parts ...
Страница 114: ...110 Section Appendices ...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices ...
Страница 122: ...Intentionally left empty ...