![IBC SL 10-85 G3 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/ibc/sl-10-85-g3/sl-10-85-g3_installation-and-operating-manual_605137042.webp)
1.
Remove the boiler door.
2.
To remove the condensate retainer,
undo the two wing nuts, and put aside.
3.
Fill the condensate trap with water, and
ensure that the bottom union cap is
hand-tightened to prevent leakage.
4.
Loosen the upper union nut, and
slide the trap over the boiler drain
outlet, and then tighten the upper
union nut.
38
Section: Installation
Содержание SL 10-85 G3
Страница 8: ...Intentionally left empty ...
Страница 14: ...Intentionally left empty ...
Страница 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Страница 78: ...Intentionally left empty ...
Страница 92: ...Intentionally left empty ...
Страница 105: ...101 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 52 Controller electrical diagram ...
Страница 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Страница 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Страница 109: ...105 Exploded views of boiler parts ...
Страница 114: ...110 Section Appendices ...
Страница 118: ...Item Description Part Quantity 200 Fan Coupler 250 749 P 347 1 205 Fan Coupler O ring 150 254 1 114 Section Appendices ...
Страница 122: ...Intentionally left empty ...