The WS1-E1 has been factory programmed with the majority of the commands and parameters installed.  It is 
necessary on commissioning of the softener to program in the 

M

3

 throughput

” and if desired another 

time of

 

day

 when regeneration is to proceed or accept the 

factory default of 2am

 and to set up the clock to register 

the current time of day. The transformer plugs into the adaptor mounted on the back face of the front panel of 
the valve 
The procedure is as follows :  

Plug in the transformer into the mains and turn on – valve will sequence to the service position

 

CUSTOMER/ INSTALLER  

PROGRAMING INSTRUCTIONS 

Step 1I

 – To enter installer display press the 

NEXT

   

and 

  buttons simultaneously for 5 seconds and 

release. Display flashes. 
 
 

Step 2I

 – Using the 

 keys 

input desired 

volumetric

 

throughput

 capacity  (table 2 ) in cubic 

meters ( Adjustable from 0.5 - 250.0). It is suggested 
the value entered be equal to the actual volumetric 
capacity minus a 1 day’s estimated water usage.   
Press 

NEXT

 to go to Step 3I 

 
 

Step 3I

 – Use   or   buttons to Set to “OFF”      . 

Press

 NEXT

 to go to Step 4I. 

 
 
 

Step 4I

 – Use   or   buttons to set the time of regen 

‘hour’

.  Press 

NEXT

 to go to Step 5I.  If the factory 

default of 2am is to be changed. 
 
 

Step 5I

 – Use   or   buttons to set the time of regen 

‘minutes’

.  Press 

NEXT

 to 

exit

 installer display. 

 

Setting Current Time of Day 

Push 

NEXT

 button until 

TIME 

of day screen is 

displayed ie bar appears under TIME function .  Press 
and hold the   OR   arrow until a arrow  appears 
against SET and 

release

 the button and the hour 

display flashes and then set the correct hour. Then 
press the 

NEXT

 button.  The minutes will flash.  Press 

the   

OR

   arrow until the correct minutes is 

displayed. Note only press 

one

 

OR 

button NOT 

both together. 
 
Press the NEXT button to return to the display screens.  
If the NEXT button is not pressed hours or minutes will 
flash for five minutes before returning to display 
screen. 
Then using the 

NEXT

 button select which screen you 

wished displayed. Recommended to leave on 

remaining-M

3

Exit  back  to  display  screen  which  would  normally  show 
‘remaining M

3

’.  Note:  When in the program mode. Step 1 to 

5.  If it is desired to go back one program step press ‘regen’ 
button to return back. 

 

Содержание AS14100MP-CL

Страница 1: ...ERATING INSTRUCTIONS Model AS14100MP CL Serial No Telephone 07 3219 2233 Facsimile 07 3219 2266 Email sales ibcwater com au Website www ibcwater com au FILTRATION WATER TREATMENT PRODUCTS for commerci...

Страница 2: ...tem Operating Pressure 330 690 kPa Temperature 4 o x 43 o C Electrical 240V 16VAC 50Hz 3 watts maximum Control Valve Series WS1 E1 with bypass valve and installation fittings WARNING A pressure reduct...

Страница 3: ...AS14100MP CL Page 3...

Страница 4: ...3 taking care not to raise the distributor pipe NEVER shorten the length of the distributor pipe STEP 6 Unpack control valve check that tank O ring is in place Fit the top strainer into the bottom of...

Страница 5: ...ipped unassembled and it is necessary to assemble the Strainer into the Valve by Matching Up the Locating Lugs and Twisting To Lock prior to the loading of the resin and screwing on the valve to the t...

Страница 6: ...ompleted 7 When used as above the tablets change the colour from green to red at a hardness of approximately 20ppm based on a sample volume of 10mls Other hardness test kits are available for more acc...

Страница 7: ...46 5 150 Note The program for M 3 input will only accept the inputting of a whole or half a number e g If the calculated throughput is say 9 75m 3 then what can be programmed in is 9 5 or 10 0 However...

Страница 8: ...T to go to Step 3I Step 3I Use or buttons to Set to OFF Press NEXT to go to Step 4I Step 4I Use or buttons to set the time of regen hour Press NEXT to go to Step 5I If the factory default of 2am is to...

Страница 9: ...le and will recommence electrically in that cycle when power is restored In long power outages it is advisable to check that the system is not in a regeneration cycle that could be discharging water t...

Страница 10: ...AS14100MP CL Page 10 MODEL AS14100MP WATER SOFTENER WITH CONTROL VALVE SERIES MODEL WS1EI...

Страница 11: ...NPS Drain Line 3 4 20mm Hose Tail Brine Line 3 8 OD Poly Tube Mounting Base 2 12 8 NPSM Height from Top of Tank 7 3 8 187mm Weight 4 5lbs 2kg Distributor Pilot 12mm Above Tank Top ELECTRICAL SPECIFIC...

Страница 12: ...Regeneration 20 Automatic Regeneration Manual Regeneration Care of Your Water Conditioner 20 General Cleaning the Injector Injector Screen Maintaining the Drain Line Brine Line and Brine Tank Overflo...

Страница 13: ...one moving part a rotating turbine that measures water usage Time and Capacity Display During normal conditioning operation the correct time of day and capacity can be accessed on the display The capa...

Страница 14: ...nflow brining and slow rinse downflow fast rinse and refill of the brine tank Optional second backwash available System operation cannot get out of phase or sequence The control always returns to a fi...

Страница 15: ...ows etc is a reasonable distance to prevent hot water damage A positive way to prevent hot water from flowing from a heat source to the conditioner is to install a check valve in the soft water piping...

Страница 16: ...Do not use a pipe wrench to tighten or loosen nuts or caps Do not place a screwdriver in the slots on caps and or tap with a hammer Do not use pipe dope or other sealant on threads Use teflon tape on...

Страница 17: ...dy and rotors are glass filled Noryl or equivalent and the nuts and caps are glass filled polypropylene All seals are self lubricating EPDM to help prevent valve seizing after long periods of non use...

Страница 18: ...AS14100MP CL Page 18...

Страница 19: ...AS14100MP CL Page 19 WS1EI Screen Display Information And Programming Instructions...

Страница 20: ...be used to estimate average daily usage PRESS DOWN ARROW FOR 3 SECONDS TO RESENT TO ZERO User 5 Shows current time Setting Time of Day Push NEXT button until time of day screen is displayed Press and...

Страница 21: ...AS14100MP CL Page 21 General Regeneration Error Screens Status...

Страница 22: ...he Injector Injector Screen The injector is the component which creates the vacuum necessary to draw the brine into the water conditioner Clean the injector and the injector screen once a year in orde...

Страница 23: ...Connection In the event of a malfunction the tank overflow connection directs overflow to the drain instead of spilling on the floor where it could cause water damage Complete the following steps to...

Страница 24: ...then move down to fill 10 Allow to fill the brine compartment Check that water is slowly flowing into the brine well by lifting up the brine well cap 11 Allow to time out and note water level in brin...

Страница 25: ...easy access front panel settings Front panel display for time of day volume remaining current flow rate and total volume used Totalizer Four methods to initiate regeneration meter immediate meter dela...

Страница 26: ...ires no switches or cams U S Patent 6 444 127 Spacer Stack Assembly The spacer stack assembly provides the necessary flow passage for water during the different cycles The all plastic spacer stack ass...

Страница 27: ...20mm push on hose elbow Water Meter or Meter Plug The water meter is installed on the outlet side of the control valve The water meter uses a turbine to measure cubic metres of treated water The turb...

Страница 28: ...AS14100MP CL Page 28 SPARE PARTS AND SERVICING INSTRUCTIONS...

Страница 29: ...er Assembly 1 2 V3107 01 WS1 Motor 1 3 V3106 01 WS1 Drive Bracket Spring Clip 1 4 V3408E1 WS1 5 PC Board EI 1 5 V3110 WS1 Drive Gear 12x36 3 6 V3109 WS1 Drive Gear Cover 1 V3002EI WS1EI Drive ASY Not...

Страница 30: ...o Description Quantity 1 V3005 WS1Spacer Stack Assembly 1 2 V3004 Drive Cap ASY 1 3 V3178 WS1 Drive Back Plate 1 4 V3011 WS1 Piston Downflow ASY 1 5 V3174 WS1 Regenerant Piston 1 6 V3135 O ring 228 1...

Страница 31: ...SSY BLACK V3010 1B WS1 INJECTOR ASSY BROWN V3010 1C WS1 INJECTOR ASSY VIOLET V3010 1D WS1 INJECTOR ASSY RED V3010 1E WS1 INJECTOR ASSY WHITE V3010 1F WS1 INJECTOR ASSY BLUE V3010 1G WS1 INJECTOR ASSY...

Страница 32: ...y Drawing No Order No Description Quantity 2 H4615 Elbow Locking Clip 1 3 JCP P 6 Polytube insert 3 8 1 4 JCPG 6PBLK Nut 3 8 1 5 H4613 Elbow Cap 3 8 1 6 V3163 O ring 019 1 7 V3165 01 WS1 RFC Retainer...

Страница 33: ...gpm for 2 6 lpm V3162 010 WS1 DLFC 1 0 gpm for 3 8 lpm V3162 013 WS1 DLFC 1 3 gpm for 4 9 lpm V3162 017 WS1 DLFC 1 7 gpm for 6 5 lpm V3162 022 WS1 DLFC 2 2 gpm for 8 3 lpm V3162 027 WS1 DLFC 2 7 gpm...

Страница 34: ...standard the illustrated Nut and 5 8 Tube Insert are only supplied as an option Water Meter and meter Plug Drawing No Order No Description Quantity 1 V3151 WS1 Nut 1 QC 1 2 V3003 WS1 Meter ASY 1 3 V3...

Страница 35: ...ting Assembly Order No V3007 01 Description WS1 Fitting 1 PVC Solvent 90 ASY Drawing No Order No Description Quantity 1 V3151 WS1 Nut 1 Quick Connect 2 2 V3150 WS1 Split Ring 2 3 V3105 O Ring 215 2 4...

Страница 36: ...ption Quantity 1 V3151 WS1 Nut 1 Quick Connect 2 2 V3150 WS1 Split Ring 2 3 V3105 O ring 215 2 4 V3145 WS1 Bypass 1 Rotor 2 5 V3146 WS1 Bypass Cap 2 6 V3147 WS1 Bypass Handle 2 7 V3148 WS1 Bypass Roto...

Страница 37: ...AS14100MP CL Page 37 10 V3156 O ring 214 2 Flow Diagrams Service and Backwash flow diagram service...

Страница 38: ...AS14100MP CL Page 38 flow diagram backwash Flow Diagram Downflow...

Страница 39: ...AS14100MP CL Page 39 flow diagram downflow brine Flow Diagrams Rinse and Fill...

Страница 40: ...AS14100MP CL Page 40 flow diagram rinse flow diagram fill WS1 Wrench Order No V3193 01...

Страница 41: ...P CL Page 41 Although no tools are necessary to assemble or disassemble the valve the WS1 wrench shown in various positions on the valve may be purchased to aid in assembly or disassembly Service Inst...

Страница 42: ...ht engaging force on top of the drive bracket while deflecting the bracket slightly to the left by pressing on the side of the upper right corner This helps the drive gears mesh with the drive cap ass...

Страница 43: ...als with an o ring To remove the drive cap assembly use the special plastic wrench or insert a to flat blade screwdriver into one of the slots around the top 2 of the drive cap assembly so it engages...

Страница 44: ...acer stack assembly can be pushed in to the control valve body bore by hand Since the spacer stack assembly can be compressed it is easier to use a blunt object 15 9mm 5 8 to 28 6 mm 1 1 8 in diameter...

Страница 45: ...the PC board Unlatch the drive assembly and lean it forward Unthread the water meter wire from the side of the drive assembly and through the drive back plate To reinstall rethread the water meter wi...

Страница 46: ...and the rotor seal Replace worn o rings Clean rotor Reinstall rotor When reinstalling the red arrow handles be sure that 1 The handle pointer are lined up with the control valve body arrows and the r...

Страница 47: ...tity 1 V3301 WS1 MICROSWITCH 1 2 V3302 WS1 MOLEX CONNECTOR 1 Not Shown V3303 WS1 MOLEX TERMINAL 3 3 V3304 WS1 SCREWS 4 40 X 5 8 2 4 V3305 WS1 RETAINING RING SS 1 5 V3306 WS1 WASHER ID 0 257 OD 0 640 1...

Страница 48: ...AS14100MP CL Page 48 INJECTOR PERFORMANCE CURVES...

Страница 49: ...AS14100MP CL Page 49...

Страница 50: ...k is completed Problem Cause Solution 1 Hard water at the tap a Low or no salt in the salt storage tank b Capacity setting to low to accommodate water hardness or water usage c Unit did not regenerate...

Страница 51: ...AS14100MP CL Page 51...

Страница 52: ...ressure b Defective injector a Increase water pressure b Replace both injector and injector cap Contact dealer 8 Brine tank overflow a Air leak in brine line to air check b Refill program setting inco...

Страница 53: ...ed motor failure e Check motor and wiring Replace motor if necessary f Drive gear label dirty or damaged missing or broken gear f Replace or clean drive gear g Drive bracket incorrectly aligned to bac...

Страница 54: ...rawing the brine solution from the salt storage tank into the resin tank Fast Rinse Purge A flow of water through the resin bed which propels any remaining brine solution out of the resin tank to the...

Отзывы: