
8.2 Inspection items and schedule
8-4
8. Maintenan
ce and Inspection
Radial cylinder type
High rigidity radial cylinder type (EC-RR
□□
AH),
High rigidity radial cylinder type (EC-RR
□□
H)
Inspection period
External
inspection
Internal
inspection
Greasing
Ball screw
Guide
Rod
sliding
surface
Start of work inspection
○
-
-
-
○
1-month inspection
○
-
-
-
-
3-month inspection
○
-
○
○
○
3-month inspection on
○
-
Depends on greasing
timing (guideline)
Every
3 months
6-month inspection
○
○
-
Every 6 months thereafter
○
○
-
Grease supply timing
Maximum operating speed [mm/s]
Grease supply timing (Guideline)
Operation distance
Months
0 to 750 or less
1,250km
12 months
Over 750 to 860
2,500km
(Guideline)
Содержание EC-RR6*AH series
Страница 9: ......
Страница 28: ...Intro 19...
Страница 130: ...1 100 1 Specifications...
Страница 183: ...2 6 Installation of radial cylinder type 2 51 2 Installation Oscillation receiving bracket movable range NJPB QRPB...
Страница 199: ...2 7 Installation of high rigidity radial cylinder type 2 67 2 Installation For EC RR7 AH and EC RR7 H...
Страница 202: ...2 70 2 Installation...
Страница 218: ...3 15 3 Wiring...
Страница 240: ...4 21 4 Operation...
Страница 315: ...9 1 Slider type 9 2 9 External Dimensions EC S7 M E Mechanical end S E Stroke end ST Stroke Unit mm...
Страница 321: ...9 4 Rod type 9 8 9 External Dimensions EC R7 M E Mechanical end S E Stroke end ST Stroke Unit mm...
Страница 323: ...9 5 Radial cylinder type 9 10 9 External Dimensions EC RR7 M E Mechanical end S E Stroke end ST Stroke Unit mm...
Страница 328: ...9 15 9 External Dimensions...
Страница 336: ...11 3 11 Warranty...
Страница 337: ...Appendix 12 1 Index 12 1 12 2 Revision history 12 7 ELECYLINDER Chapter12...
Страница 346: ......
Страница 347: ......