IAC INDUSTRIES Quick Ship WORKMASTER Скачать руководство пользователя страница 7

 

 

QS WM Instrument Shelf: 

 

HARDWARE KIT QS-HWR045 
 
 
 
 
 
 
 

Step 1:

 

Place the instrument top upside down on smooth flat surface being sure to protect it from damage by foreign 
objects. IAC recommends the use of packing type blankets or clean cardboard. Place the riser boxes onto the 
instrument shelf aligning the slots in the riser boxes with the threaded inserts in the instrument shelf as 
shown. The side of the riser box that has holes in it, face the rear of the instrument shelf. Thread 1/4-20 x .75 
hex head bolts and 1/4” flat washers into the threaded inserts in the instrument shelf. DO NOT TIGHTEN 
THIS HARDWARE. 

 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 

 
 

 
 
 
Step 2:

 

Connect the support beam

 

to the riser boxes using the 1/4-20 x .75" hex head bolts 1/4" flat washers and 1/4-

20 keps nuts. Align support beam ends with holes in riser boxes and push bolts through the support beam 
ends plates and holes in the riser boxes. Attach keps nuts to bolts on the inside of riser boxes and tighten. 
Align the riser boxes to even the overhangs and then tighten riser box attachment hardware. Install all plastic 
cap plugs that apply. If you have Riser 

Electrical Panels do not install the 1.5” cap plug. 

 

Note:

 

If you are assembling a 96” instrument shelf you will have a second beam that is mounting in rear of the 

shelf the same as in the front. 

 

Note:

 If you are installing a WM Undershelf Light please see page 9 at this time. 

Содержание Quick Ship WORKMASTER

Страница 1: ...USTRIES Quick Ship WORKMASTER WORK BENCHES IAC INDUSTRIES 3831 S BULLARD AVE GOODYEAR AZ 85338 Phone 714 990 8997 Fax 714 990 0557 www iacindustries com QS Workmaster REV 042318P65 Assembly Instructio...

Страница 2: ...ter Leg Extender Kit 16 ESD Grounding Cleaning PLEASE NOTE Quick Ship Accessories include assembly instructions in their own packaging when packed by individually Please look for these instructions wh...

Страница 3: ...If the assembly is going to take more than one day all individual hardware pieces should be returned to a central location Check all parts and hardware kits against the itemized packing list found wit...

Страница 4: ...422 if parts are missing HARDWARE KIT QS HWR0078 1 4 20x3 4 Hex Head Bolt 1 4 Flat Washer 5 16 18x3 4 Hex Head Bolt Beam Connector Plate HARDWARE KIT COMPONENTS Description Qty 1 4 20 x 3 4 Hex Head B...

Страница 5: ...nd securing the frame support beams to the work surface Step 2 Place worksurface top side down on smooth flat surface being sure to protect it from damage by foreign objects IAC recommends the use of...

Страница 6: ...inserts in the worksurface as this could cause the insert to pull out Step 4 Slide the workbench leg extender into the pedestal tube making sure the plastic insert in the end of the leg extender is ex...

Страница 7: ...DO NOT TIGHTEN THIS HARDWARE Step 2 Connect the support beam to the riser boxes using the 1 4 20 x 75 hex head bolts 1 4 flat washers and 1 4 20 keps nuts Align support beam ends with holes in riser b...

Страница 8: ...nto each hole Tighten at this time Install plastic caps where needed Note For SESIS Panels CAUTION Risk of Electric Shock Do NOT plug into another Relocatable power tap STEP 4 Carefully turn instrumen...

Страница 9: ...ten Install the appropriate light tube It is a good idea to test the light at this time by plugging it in and turning it on and off If the light tube does not light please double check that the power...

Страница 10: ...down when bench is upright 3 Hold the unistrut nut against the inside of the cross brace and attach the footrail tube with a 1 4 20 x 1 00 hex bolt split washer and flat washer on each end The footrai...

Страница 11: ...r the top of the worksurface while fitting the lower flange of the TE2 mounting brackets under the worksurface Looking under the worksurface align the slots in the TE2 mounting brackets with the inser...

Страница 12: ...install drawer bracket and drawer s while bench in upside down Step 1 Install rear mounting bracket as shown on below drawings using hardware listed above Note The position of your bracket will be det...

Страница 13: ...press down on the right side tab and pull on drawer body Step 4 With the drawer removed from the case place the case over the front beam and the drawer mounting bracket as shown Use supplied hardware...

Страница 14: ...mechanism close the spring loaded Red locking mechanism by turning the switch up or down depend on what side your setting position until the Red locking mechanism closes Switch Before installing the...

Страница 15: ...g sure the threaded holes on the plate caster leg extender tube are on the same side as the holes in the pedestal tube Align the threads of the leg extender with the holes in the pedestal tube and sel...

Страница 16: ...ly and that the ESD material is working properly Cleaning ESD Materials ESD laminates are designed to resist abrasion scuffing scorching and most solvents Intense exposure to any of these conditions c...

Отзывы: