Rev: 1.0
Hyundai Electronics Confidential Proprietary
5
FIGURE 3.3-2
12
FIGURE 3.4-1 RIGHT SIDE
12
FIGURE 3.4-2 LEFT SIDE
13
FIGURE 3.5-1
13
List of Tables
TABLE 4.1.1-1 PCS OPERATING FREQUENCY
14
TABLE 4.2.1-1 BASE STATION DELAY BUDGET
15
TABLE 4.3.2-1 PRIMARY POWER AC INPUT VOLTAGE RANGE REQUIREMENT
15
TABLE 4.3.2-2 MAXIMUM PRIMARY POWER OUTPUT REQUIREMENT
15
TABLE 4.3.2-3 BATTERY POWER REQUIREMENT
15
TABLE 4.4-1 PHYSICAL SPECIFICATIONS
16
TABLE 4.5-1 ENVIRONMENTAL SPECIFICATIONS
16
TABLE 6.1-1
17
TABLE 6.2-1
18
TABLE 6.2-2
18
TABLE 6.3-1
18
TABLE 7.1.1-1
19
TABLE 7.1.2-1 NOTATIONAL CONVENTIONS
19