INSTALLATION & OPERATION MANUAL
L500 Series
- 59 -
MAINTENANCE SCHEDULE
1) Replace the coolant every two years.
2)
For detailed propulsion system information, refer to the manufacturer’s manual.
3) Replace the engine oil after the first 100 hours of operation.
CAUTION
YOU SHOULD EXERCISE THE UTMOST CARE TO PREVENT INJURY
TO YOURSELF OR ENGINE DAMAGE WHENEVER PERFORMING
ANY MAINTENANCE OPERATIONS.
Daily
250h
600h
1000h
Minimun 1 y
/Necessary
Check coolant level and check for leaks
1)
○
Clean Seawater strainer
○
Check for Exhaust system leaks
○
Check for Fuel system leaks
○
Check the engine oil level and check for
leaks
○
Check the battery operating voltage
○
Check the oil level and check the steering
system for leaks
○
Check transmission lubrication level and the
propulsion system
2)
for leaks
○
Engine oil and filter
3)
●
◇
Check the sacrificial anodes
1)
Anti corrosion
system
●
◇
Check hose clamps for tightness and
corrosion
◇
◇
Check the electrical system for tight
connections
◇
◇
Check tightness of the bolts, nuts and other
fasteners
◇
●
◇
Fuel filter and water separator
◇
●
◇
Air filter
◇
●
◇
Drive belt
◇
◇
Heat exchanger tube bundle
◇
◇
Inter-cooler tube bundle
◇
◇
Checking Inter-cooler automatic drain valve
◇
◇
Replace the seawater pump impeller
◇
●
◇
Turbocharger
◇
◇
○
: Check/Clean,
◇
: Check (Replace if Necessary),
●
: Replace
Содержание L500 SERIES
Страница 1: ...INSTALLATION OPERATION MANUAL L500 Series...
Страница 11: ...INSTALLATION OPERATION MANUAL L500 Series 10 PERFORMANCE CURVES...
Страница 14: ...INSTALLATION OPERATION MANUAL L500 Series 13 ENGINE DIMENSIONS Top Side Front...
Страница 62: ...INSTALLATION OPERATION MANUAL L500 Series 61 MAINTENANCE LOG DATE MAINTENANCE PERFORMED ENGINE HOURS...
Страница 71: ...INSTALLATION OPERATION MANUAL L500 Series...