INSTALLATION & OPERATION MANUAL
L500 Series
- 41 -
• Using an ohmmeter, check that there is
continuity between each terminal.
RELAYS
• Grounded to terminal 85 by supply 24V to terminal 86.
• Check for continuity between terminals 30 and 87.
• Always replace a damaged relay with one of the
same rating.
Terminal
Continuity
30 - 87
NO
30-87a
YES
85 - 86
YES
①
Reserve-20Amp
⑦
Air heater-20Amp
②
Main-20Amp
⑧
Starter solenoid-20Amp
③
Fuel heater-20Amp
⑨
Power key-20Amp(5Pin)
④
Oil pump-20Amp
< 4 Pin >
< 5 Pin >
Содержание L500 SERIES
Страница 1: ...INSTALLATION OPERATION MANUAL L500 Series...
Страница 11: ...INSTALLATION OPERATION MANUAL L500 Series 10 PERFORMANCE CURVES...
Страница 14: ...INSTALLATION OPERATION MANUAL L500 Series 13 ENGINE DIMENSIONS Top Side Front...
Страница 62: ...INSTALLATION OPERATION MANUAL L500 Series 61 MAINTENANCE LOG DATE MAINTENANCE PERFORMED ENGINE HOURS...
Страница 71: ...INSTALLATION OPERATION MANUAL L500 Series...