4. Operation
48 TSα Series User Manual
⑦ EOAT Rotation
EoatRot : EOAT Rotation, means Chuck(EOAT) rotation time setting.
Default setting is
“
BeforeT
”
. ( Before Traverse )
Display
Description
Motion
BeforeT
(=Default)
Before T : Before Traverse Movement.
EOAT unit rotates before traverse
movement to prevent EOAT unit from
crash with Safety Door. ( After Kick )
NoKick
No Kick : No Kick , Before Traverse
Movement.
EOAT unit rotates before Kick motion
and traverse movement to prevent EOAT
unit from crash with Safety Door. ( After
Kick ) and Core of the Mold ( Some Mold
has core )
WhileT
WhileT : EOAT Rotation While Moving
Operate Traverse, Kick, EOAT Rotation
simultaneously. ( High Speed ).
MArmDn Nozzle
SArmDn Clamp
EOATRot BeforeT
◀
MArmOff Off
Содержание TS-200DI
Страница 2: ......
Страница 14: ...xii...
Страница 15: ...xiii...
Страница 19: ......
Страница 20: ......
Страница 21: ...1 Introduction...
Страница 22: ......
Страница 28: ......
Страница 29: ...2 Before Operation...
Страница 30: ......
Страница 41: ...3 START UP STOP...
Страница 42: ......
Страница 47: ...4 OPERATION...
Страница 48: ......
Страница 110: ...4 Operation 90 TS Series User Manual 4 10 Change Language Press and at the same time change Korean English Chinese...
Страница 114: ......
Страница 115: ...5 Follow Up...
Страница 116: ......
Страница 126: ......
Страница 127: ...6 Error...
Страница 128: ......
Страница 134: ......
Страница 135: ...Appendix...
Страница 136: ......
Страница 139: ...Appencix TS Series User Manual 119 B 2 TS 300DI dimension Unit mm Type A B 300SI 1005 58 300DI 875 188...
Страница 141: ...Appencix TS Series User Manual 121 C 2 TS 300DI Unit mm Type A B C D 300SI 1173 58 1273 235 300DI 1043 20 1243 280...
Страница 143: ......