Page 50
As part of the maintenance works, the screw terminals must be
checked and retightened, if necessary.
The steam humidifier’s performance and maintenance intervals
depend primarily on the existing water quality and the quantity of
steam generated. Variable water quality can lengthen or shorten
the maintenance interval. Ongoing maintenance intervals can be
estimated based on the amount and type of residue found in the
steam cylinder. Immediate cylinder maintenance is indicated by:
Immediate cylinder maintenance is indicated by:
•
a
green, blinking LED
on the display and operating
panel.
•
the display reads
Service
(only with controls of Type Com-
fort and Comfort Plus).
8.1
Maintenance for Operation with Demineralized
Water / Condensate
Instructions for maintenance and cleaning intervals are based
exclusively on typical, empirically determined values.
Cycle
Maintenance Task
4 Weeks after
Initial Operation
Visual check of electrical and mechanical
connections.
Visual check of water level control.
Visual check of steam cylinder interior.
Annually
Visual check of electrical and mechanical
connections.
Visual check of water level control.
Visual check of heater elements / thermo
sensor.
Visual inspection of interior of steam cylinder.
If needed, cleaning of steam cylinder, heater
elements and thermo sensor.
Содержание HeaterCompact HC02
Страница 69: ...Page 69 10 EC Declaration of Conformity...
Страница 76: ...Page 76 13 Exploded View...
Страница 77: ...Page 77 14 View of Cabinet 56 57 51...