![HydroTherm VSB2-605 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/hydrotherm/vsb2-605/vsb2-605_installation-operation-and-maintenance-manual-and-replacement-parts-list_2192593009.webp)
9
All electrical and control wiring must be installed in
accordance with the codes listed in Section 1 of this
manual. Follow the wiring diagram for your particular
installation as shown in Figures 2.8, 2.9, 2.10 and 2.11.
For vent damper-equipped models, connect thermostat
to blue leads (see Figure 2.4).
NOTE: If any of original wire supplied with boiler
must be replaced, use similar wire of 105 C rating.
Otherwise, insulation may melt or degrade, expos-
ing bare wire.
NOTE: Boiler transformer must not be used to
power external accessories (i.e., zone valves,
relays, etc.) Otherwise, transformer will be overload-
ed and burn out.
FIGURE 2.8: WIRING DIAGRAM & OPERATION
SEQUENCE FOR BOILERS EQUIPPED WITH INTER-
MITTENT PILOT, VENT DAMPER & M & M #67 LOW
WATER CUT-OFF
FIGURE 2.9: WIRING DIAGRAM & OPERATION
SEQUENCE FOR BOILERS EQUIPPED WITH INTER-
MITTENT PILOT, VENT DAMPER & M & M #67 LOW
WATER CUT-OFF
STEP 6: WIRING BOILER
WARNING: Turn off electrical power supply before
servicing. Contact with live electric components
can cause electric shock or death.
Содержание VSB2-605
Страница 23: ...23 NOTES...