VSB2-605
42-9187
VS-B SERIES
INSTALLATION, OPERATION
& MAINTENANCE MANUAL
AND REPLACEMENT
PARTS LIST
Gas-Fired Steam
Cast Iron Boilers
85,000 to 165,000 Btuh Input
Intermittent
Pilot/Vent Damper
And
Standing Pilot/Vent Damper
260 NORTH ELM ST. • WESTFIELD, MA 01085 • (413) 564-5515 • FAX (413) 568-9613
5211 CREEKBANK ROAD • MISSISSAUGA, ONTARIO L4W 1R3 • (905) 625-2991 • FAX (905) 625-6610
SECTION 1: INTRODUCTION
Code Compliance ..........................................................2
Venting Requirements ...................................................2
Chimney Requirements .................................................3
Combustion Air Requirements ......................................3
Water Treatment ............................................................3
Shipment of Boiler .........................................................3
SECTION 2: BOILER INSTALLATION
Step 1: Locating/Setting Boiler ......................................4
Step 2: Installing Steam Piping .....................................5
Step 3: Installing Hydronic Components .......................5
Step 4: Venting Boiler.....................................................6
Step 5: Installing/Testing Gas Piping..............................7
Step 6: Wiring Boiler ......................................................9
SECTION 3: START-UP & OPERATION
Sequence Of Operation................................................11
Prior To Start-Up ..........................................................11
Start-Up & Adjustments................................................11
SECTION 4: MAINTENANCE
Before Each Heating Season .......................................15
How To Change Orifices...............................................16
Heating System Problems & Causes ...........................16
REPLACEMENT PARTS ..............................................17
TABLE OF CONTENTS
Содержание VSB2-605
Страница 23: ...23 NOTES...