background image

9  

Programming Instructions 

TIME  OF  DAY,  YEAR, 

MONTH, DAY,  

Time of day is for normal op-
eration  of  system  and  the 
scheduling  of  the  regenera-

tion  time.    The  date  is  used 
in  a  diagnostic  function  to 
track  the  last  time  the  sys-

tem regenerated. 
 

SET HARDNESS

 

This  value  is  the  maximum 
compensated water hardness 
in  grains  per  gallon  of  the 
raw water supply.  It is used 

to  calculate  the  system  ca-
pacity.  If Ferrous Iron is pre-
sent  add  4  gpg  for  every  1 

ppm of Ferrous Iron. 
 

SET PEOPLE

 

This  value  is  the  number  of 
people living in the home.  It 
is  used  to  calculate  the 
amount  of  water  needed  for 

daily use and the reserve ca-
pacity of the system. 
 

SALT SETTING 

There  are  3  settings  to 
choose  in  the  MENU  SET-

TINGS.    These  settings  will 
determine  the  salt  dosage 
and  capacity  for  the  system.  

For SIM units choose IRON & 

MN. 
 

WATER TYPE

 

Select  WELL  /  OTHER  if  any 

Iron or Manganese is present 
or  if  the  water  source  is  not 
clean  (<  1NUT  turbidity).  

The  system  will  back  wash 
every time. 
 

REGEN TIME

 

This  setting  determines  the 
time  of  day  to  perform  a 
scheduled regeneration.

 

 

REGEN DAYS

 

This  value  is  the  number  of 

days  between  regenerations 
or  back  washes  to  clean  the 
filters. 

 

GALLONS

 

Default  value  is  OFF.    Adjust 
the  GALLONS  to  set  the  ca-

pacity.    This  will  cause  the 
unit  to  regenerate  either 
when  the  gallons  remaining 

goes  to  zero  or  the  days  be-
tween  regeneration  is  zero.  
Which ever occurs first. 

Содержание 15100300

Страница 1: ...applying provided with install kit NSF cer ed lubri cant to all seals 3 This system is not intended for trea ng water that is microbiologically unsafe or of unknown quality without adequate disinfec o...

Страница 2: ...treating water that is microbiologi cally unsafe or of unknown quality without adequate disinfection before or after the system For your safety the information in this manual must be followed to mini...

Страница 3: ...ces Use only lead free solder and flux for all sweat solder connections as required by state and federal codes Maximum allowable inlet water pressure is 125 psi If daytime pressure is over 80 psi nigh...

Страница 4: ...viously manufactured products or to note the change These softeners conform to NSF ANSI 44 for the specific performance claims as verified and substantiated by test data These models are efficiency ra...

Страница 5: ...ot covered by the war ranty Put the softener in a place water damage is least likely to occur if a leak develops The manufacturer will not repair or pay for water damage A 120 volt electric outlet to...

Страница 6: ...his could cause damage to the valve 5 Connect the drain hose 10 ft included to the valve and secure it with a hose clamp also included Run the drain hose to the nearest laundry tub or drain pipe This...

Страница 7: ...7 Installation...

Страница 8: ...or the full amount of time as dis played on the screen to insure a proper brine solution for the next regeneration 7 The valve will automatically advance to the SERVICE position Open the outlet valve...

Страница 9: ...daily use and the reserve ca pacity of the system SALT SETTING There are 3 settings to choose in the MENU SET TINGS These settings will determine the salt dosage and capacity for the system For SIM un...

Страница 10: ...ll pause on the Date and Time page for 5 seconds Then it will continually scroll through all of the system diagnostic display pages Depending on the Valve Type some pages will not be dis played To man...

Страница 11: ...metime during the night and manual regenerations should be performed when little or no water will be used in the household Normal regeneration time is 2 00 AM When the system capacity is near exhauste...

Страница 12: ...Use only crystal water softener salt Check the salt level monthly It is important to main tain the salt level above the water level To add salt simply lift the salt lid and add the salt directly into...

Страница 13: ...ontrol valve body 3 Carefully remove the assembly and disassemble as shown in above figure 4 The injector orifice is removed from the valve body by carefully turning it out with a large screwdriver Re...

Страница 14: ...t the BLFC holder apart and remove the flow washer 4 Reassemble using the reverse procedure TIP Markings on the BLFC washer should face the direction as shown here Replacing Drain Line Flow Control DL...

Страница 15: ...a to form or grow However during shipping storage installing and operating bac teria could get into the softener For this reason sanitizing as follows is suggested when in stalling Sani System Liquid...

Страница 16: ...16 Brine Tank Res Up Feeder Assembly Step 3 Install brine well Feed wick from feeder into the opening in the brine well cap...

Страница 17: ...17 Main Repair Parts Connectors A A A B D F E A C...

Страница 18: ...STON ASSEMBLY 60010035 INJECTOR SET 00 VIOLET 60010130 85HE SEAL SPACER KIT 60010034 INJECTOR SET 0 RED 60010131 85HE DLFC 1 1 5 GPM 60010033 INJECTOR SET 1 WHITE 60010132 85HE DLFC 2 2 0 GPM 60010032...

Страница 19: ...19 Control Valve Parts List...

Страница 20: ...20 Power Head Exploded View...

Страница 21: ...21 Power Head Parts List...

Страница 22: ...22 Trouble Shooting...

Страница 23: ...anature WaterGroup will provide a replacement mineral tank or brine tank to any original equipment purchaser in possession of a tank that fails provided that the water conditioner is at all times oper...

Отзывы: