- 5 -
Normal Operation
The control box automatically switches to normal operation once the initiation phase has
elapsed, whereby the individual actual operation sequences are shown in the display and by
the LED lights.
The individual operation phases are shown optically. The below display monitoring is shown
during continuous operation.
LED
– Light Sequence
Display Monitor
All 8 LED’s light successively (GREEN phase),
positive d.c. (approx. 100 V) is released to the
water part
Duration about 26 s
LED : GREEN
Monitoring of day, date and time
Operation state Monitoring current rate
The current ratings for the corresponding HY-
MAG
types are
shown in the below list
REFIT
®
– Phase
Duration about 4 s (magnetic remanence
clearing, LED extinguishes successively to the
left within 4 seconds
– GREEN LED)
LED : GREEN
LED REFIT Phase : YELLOW
All 8 LED’s light successively (RED), negative
d.c. (approx. 100 V) is released to the water
part
Duration about 26 s
LED : GREEN
REFIT
®
– Phase
Duration about 4 s (magnetic remanence
clearing, LED extinguishes successively to the
left within 4 seconds
– RED LED)
LED : GREEN
LED REFIT PHASE : YELLOW
Thu 11.10.2003 10:30
Cont. operation + xxx mA
Thu 11.10.2003 10:30
Cont. operation + 0mA
Thu 11.10.2003 10:30
Cont. operation - xxx mA
Thu 11.10.2003 10:30
Cont. operation - 0mA