- 4 -
Initiation Phase
Once the control box was connected to the mains power and switched on, the initiation
phase and an initial system check is started automatically. Every individual and actually
running operating sequence is shown in the LCD-display.
Standard display:
Control box test:
Short-circuit test:
Operation - test:
Technical operation check of complete HY-
MAG
system (control box
and water conditioning unit). The below individual sequences are
shown
Test thermal protection
Actor
– test
Temp. test: OK
Test current to water conditioning unit
See list of individual current rates for
units (nom. width)
Pre-set water conditioning unit
–
example HY-
MAG
DN100
Check remanence clearance
H Y D R O T E C
Integral V. 1.00
Short-circuit - test
Test OK
Control box - test . . . .
Control box OK
Actor
– test
current: xxx mA
Actor
– test
Hydromag type: DN 100
Actor
– test
Time reman. clearance: OK