5-15: Machine Maintenance
Machine Maintenance: 5-14
To install the intermediate retainers and the low pressure seals:
1. Insert the brass intermediate retainer into the cavity.
2. Press the new low pressure seal into the brass low pressure seal retainer and install
a new O-ring on the outside (see Figure 5-14).
3. Press the low pressure seal assembly into the cavity (see Figure 5-15).
Figure 5-14. Install Retainers into Cavities
Figure 5-15. Press Low Pressure Seal Assembly into Cavity
Re-Installing Manifold
1. Position the outer plungers at the same position (see Figure 5-16).
2.
Re-install manifold and torque the fasteners in an “X” pattern to 50% of specification
and then retorque to 100% specification (see
1
3
4
2
5
8
7
6
1
3
4
2
5
8
7
6
Figure 5-16. Re-install Manifold and Torque Fasteners
Figure 5-17. Torque Sequence
in “X” Pattern
Figure 5-18. Torque Bolts to
22 ft. lbs
Содержание Boxxer 423s
Страница 5: ...Boxxer 423S Owner s Manual vi ...
Страница 15: ...General Information 1 18 ...
Страница 25: ...Cleaning Information 3 10 ...
Страница 29: ...Operating Instructions 4 6 ...
Страница 43: ...6 3 Water and Chemical System Figure 6 1 Flow Diagram View 1 of 3 000 179 045 Rev A ...
Страница 45: ...Water and Chemical System 6 6 ...
Страница 49: ...Electrical System 7 6 ...
Страница 56: ...Systems Troubleshooting 8 12 ...
Страница 85: ...9 56 Assemblies and Parts Lists ...
Страница 87: ...How to Order Parts 10 2 ...
Страница 90: ...Warranty Information 11 4 ...
Страница 92: ...Accessories and Chemical Solutions 12 2 ...