
Preparing installation/preparing tank
OXiStop OXS-LID
en
Page 33 / 112
MoWa OXS-LID 3992764e en-us 2018-08-10.docx
2018-08-10
Tightening sequence
The screws on the OXS--30/45/70LID are to be tightened as follows:
Number of screws n = 26; nominal torque Mn = 7 Nm
1.
Tighten screws 1-6 with 20% of the nominal torque.
2.
Check plane parallelism.
3.
Tighten screws 1-6 with 60% of the nominal torque.
4.
Tighten screws 1-6 with 105% of the nominal torque.
5.
Tighten screws 7-n with 105% of the nominal torque.
6.
Tighten screws 1-n with 105% of the nominal torque.
7
Check screws 1-n with 100% of the nominal torque.
Содержание OXiStop OXS 150LID
Страница 54: ...Performing Maintenance OXiStop OXS LID en Page 54 112 MoWa OXS LID 3992764e en us 2018 08 10 docx 2018 08 10 ...
Страница 59: ...Performing Maintenance OXiStop OXS LID en Page 59 112 MoWa OXS LID 3992764e en us 2018 08 10 docx 2018 08 10 ...
Страница 93: ...Spare parts list OXiStop OXS LID en Page 93 112 MoWa OXS LID 3992764e en us 2018 08 10 docx 2018 08 10 ...
Страница 106: ......
Страница 107: ......
Страница 108: ......
Страница 109: ......
Страница 110: ......
Страница 111: ......