
The tank must be sited vertically and on a flat level surface.
The supplied scale filter must be fitted and changed at least every 6 months,
otherwise the lifespan of the product could be seriously reduced and the
warranty may be void.
The supplied scale filter is suitable for up to 300 ppm. You may need to upgrade
to a higher capacity filter in more aggressive water areas.
Note these are larger
in size so ensure sufficient space is available.
A pressure reducing valve is required if the mains pressure is above 0.42 MPa (4.2
bar).
The Zen Life is factory set at 100°C. The temperature can be switched down to
98°C should this be desired. Please see Section 6 for further instructions.
White washers are to facilitate water connections on hoses labelled ‘tank to tap’
and ‘manifold to tank’.
Black washers are to facilitate water connections on hose labelled ‘manifold to
exp vessel’.
Ensure that all hose connections are tightened using a suitable spanner.
Ensure that the tank, power socket, service valve and installation kit (manifold,
relief valve and expansion vessel) are positioned to allow future maintenance.
1. Installation
Important Information
6
Содержание Zen Life LIFE3L
Страница 7: ...Diagram 1 Installation without Crossover Valve 7...
Страница 9: ...Diagram 2 9...
Страница 15: ...Diagram 4 Installation with Crossover Valve 15...
Страница 17: ...Diagram 6 Diagram 7 17...
Страница 23: ...3L Model PC Board Diagram 8 6L Model PC Board Diagram 9 23...
Страница 29: ......