
4. Electrical Connection
•
Ensure that the installation area is dry.
•
The boiling water tank is supplied with a pre-wired (1m) BS plug.
•
Insert the plug into a suitable socket and turn the power socket on at the switch.
•
The boiling tank will take approx 13 minutes to heat up from cold, depending on
incoming water temperature.
•
Check for signs of discharge from the pressure relief valve.
IMPORTANT
•
Following the first boiling cycle it is imperative to check all connections on the
boiling side and tighten all flexible hoses to and from the tank as these can
loosen on the first boiling cycle.
•
Before plugging the tank into the power socket, the system must be full of
water and tested for leaks.
19
Содержание Zen Life LIFE3L
Страница 7: ...Diagram 1 Installation without Crossover Valve 7...
Страница 9: ...Diagram 2 9...
Страница 15: ...Diagram 4 Installation with Crossover Valve 15...
Страница 17: ...Diagram 6 Diagram 7 17...
Страница 23: ...3L Model PC Board Diagram 8 6L Model PC Board Diagram 9 23...
Страница 29: ......