Installation and Maintenance Manual
65
Battery Connection Diagram
Connect six wires to the gate operator as shown.
Install batteries as show, observing polarity:
Four 14 gauge wires to the control circuit.
Always connect red wires to (+) and black wires to (-). The exception is
Connect from lug terminals to DC motor:
the jumper wire which connects the two batteries.
Two 6 gauge minimum for 1hp operators
Two 2 gauge minimum for 2hp operators
Содержание SwingRiser 14
Страница 2: ......
Страница 18: ...Installation and Maintenance Manual 8 Tools Required for an Efficient Installation ...
Страница 19: ...Installation and Maintenance Manual 9 Swing Gate Post Details ...
Страница 20: ...Installation and Maintenance Manual 10 Swing Gate Post Details continued ...
Страница 21: ...Installation and Maintenance Manual 11 Swing Gate Post Details continued ...
Страница 22: ...Installation and Maintenance Manual 12 HRG 220 Pump Pack ...
Страница 23: ...Installation and Maintenance Manual 13 HRG 222 Pump Pack ...
Страница 24: ...Installation and Maintenance Manual 14 How Our Hydraulic Swing Gates Work ...
Страница 32: ...Installation and Maintenance Manual 22 ...
Страница 36: ...Installation and Maintenance Manual 26 New Generation Smart Touch Board Runs software 4 xx and higher ...
Страница 54: ...Installation and Maintenance Manual 44 Loop Layouts ...
Страница 77: ...Installation and Maintenance Manual 67 ...
Страница 83: ...Installation and Maintenance Manual 73 Smart Touch Controller Connections ...
Страница 84: ...Installation and Maintenance Manual 74 ...