Installation and Maintenance Manual
50
24Hr / 7 Day Time Clock Option
This is an option you can order from HySecurity. The timer generates an open command which will hold
the gate open until it is released. Instructions on how to use and program it accompany the timer.
To connect the optional timer to the Smart Touch Controller, use the following schematic:
Connect the Timer Power Pin 1 to 24V (+)
Connect the Timer Power Pin 2 to COM
Connect the Timer Com Pin 3 to COM
Connect Timer NO Pin 4 to #7, Time Clock Open
Connecting a Radio Receiver
Mount a commercial style 24 Volt radio receiver (external antenna type) on the inside of the operator,
below the electrical box. Knock out the smallest hole in the lower right corner of the electrical box and
route the wires to the area marked Radio Options. Only three wire connections are needed because the
24-Volt supply and the radio output share a wire. Being certain to observe polarity, crimp the black radio
power wire together wit
h one of the radio output wires into a .25‖ spade connector and connect to the
COM terminal.
Connect the red wire to the
+24V terminal and connect the
other radio output contact wire
to the spade marked OPEN.
Note that this terminal is the
same as the #4 input terminal
labeled Edge Sensor on the
main control board.
Mount an external antenna
onto the top of a fixed post of
the fence near the operator.
Connect the antenna into the
socket on the radio receiver.
Set the DIP switches in the
receiver to match the same
code used in the transmitter.
If an edge sensor transmitter is connected, be certain to use a two channel commercial receiver.
Remember that each transmitter and receiver must have their codes set the same or they will not
function.
Содержание SwingRiser 14
Страница 2: ......
Страница 18: ...Installation and Maintenance Manual 8 Tools Required for an Efficient Installation ...
Страница 19: ...Installation and Maintenance Manual 9 Swing Gate Post Details ...
Страница 20: ...Installation and Maintenance Manual 10 Swing Gate Post Details continued ...
Страница 21: ...Installation and Maintenance Manual 11 Swing Gate Post Details continued ...
Страница 22: ...Installation and Maintenance Manual 12 HRG 220 Pump Pack ...
Страница 23: ...Installation and Maintenance Manual 13 HRG 222 Pump Pack ...
Страница 24: ...Installation and Maintenance Manual 14 How Our Hydraulic Swing Gates Work ...
Страница 32: ...Installation and Maintenance Manual 22 ...
Страница 36: ...Installation and Maintenance Manual 26 New Generation Smart Touch Board Runs software 4 xx and higher ...
Страница 54: ...Installation and Maintenance Manual 44 Loop Layouts ...
Страница 77: ...Installation and Maintenance Manual 67 ...
Страница 83: ...Installation and Maintenance Manual 73 Smart Touch Controller Connections ...
Страница 84: ...Installation and Maintenance Manual 74 ...