![Hussmann Freedom Line series Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/hussmann/freedom-line-series/freedom-line-series_installation-and-operation-manual_2189217010.webp)
1-6
I
nstallatIon
P/N 0520677_W
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM
FINAL LOCATION
Once the case reaches its final location,
reassemble the wireway and door handles as
follows:
1. Reinstall wireway pan in reverse order of
removal.
2. The ground lug must be reinstalled using the
two screws provided.
3. Replace the conduit connectors and plastic
gromets to the wireway pan.
4. Replace wireway cover, piping cover,
bumper and door handles.
At completion of all electrical work,
installation contractor shall re-install the
front panels using care to ensure all panels are
centered and properly fastened.
Be sure to replace all screws and secure all
components. The condensing unit produces
vibration that can cause screws to loosen.
LEVELING
Merchandisers must be installed level to ensure
proper operation of the refrigeration system
and to ensure proper drainage of defrost water.
When leveling merchandisers, use a carpenter’s
level as shown.
Metal leveling shims or wedges are provided
with each merchandiser for use if needed.
NOTE:
B
egIn
lIneup
levelIng
from
the
hIghest
poInt
of
the
store
floor
.
Place shims under the rail and make sure
that they are positioned at a base component
(crossbar). This transfers the weight directly
from the loaded case through to the floor.
See illustration below.