PRODUCT INSTALLATION MANUAL
DD13 2T SERVICE DELI
_________________________________________________________________________________________________________________________
Page 14
Hussmann
Attaching Kickplates
(This should be done after final Installation of Refrigeration and Drainage connections)
Attach kickplates and, if required, silicon seal to the floor once installation is complete and drains checked for water leaks.
Front Panel
1. Attached front panel and align with front skid rail refer figure 12.
2. Push front panel into bottom and top clips.
3. Check front panel is securely in position.
Fig (12) Attached front panel
Back Panel
1. Attached back panel and align with back skid rail refer figure 13.
2. Push back panel into bottom clip and over top clips.
3. Check back panel is securely in position.
Fig (13) Attached back panel